Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
11 S 6TH AV
Address NEW:
11 S 6TH AV
Apply Date:
09/26/2024
Applicant:
Armand Pena
Description:
Tenant Improvement of existing market into mixed use food hall and market.

Permit Reviews

Permit Number - TC-COM-0924-01869
Permit Status: Complete
Permit Description: Tenant Improvement of existing market into mixed use food hall and market.
Start Date Submittal Complete Date Status  
09/30/2024 COMMERCIAL REVIEW - FULL v.1 10/28/2024 REQUIRES RESUBMIT Review Details
01/14/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/15/2026 REQUIRES RESUBMIT Review Details
11/22/2024 COMMERCIAL REVIEW - FULL v.2 12/16/2024 REQUIRES RESUBMIT Review Details
01/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/13/2025 APPROVED Review Details
06/25/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/29/2026 APPROVED Review Details
07/02/2026 SPECIAL INSPECTION REVIEW v.1 07/06/2026 APPROVED Review Details
12/30/2024 RESTAMP - COMMERCIAL v.1 01/03/2025 APPROVED Review Details
12/24/2024 COMMERCIAL REVIEW - FULL v.3 12/30/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0924-01869
Permit Status: Complete
Permit Description: Tenant Improvement of existing market into mixed use food hall and market.
Date Description Comments
06/29/2026 AIR BALANCING REPORT IS REQUIRED.
12/26/2024 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
12/26/2024 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
12/26/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
12/26/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/26/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
12/26/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
01/13/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/26/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
12/26/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0924-01869
Permite Description: Tenant Improvement of existing market into mixed use food hall and market.
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
07/30/2025 COT - HCBU - Stem Wall/Retaining Wall N/A Not Applicable
07/30/2025 BULD - Electrical Clearance N/A Not Applicable
COT - FCON - Fire - Final N/A Not Ready
07/07/2026 COT - HCPL - Sewer N/A Not Applicable
07/07/2026 COT - HCPL - Backwater Valve N/A Not Applicable
07/07/2026 COT - HCBU - Preslab N/A Not Applicable
07/07/2026 COT - HCBU - Building Progress N/A Not Applicable
07/07/2026 COT - HCBU - Building Above Ceiling N/A Not Applicable
09/23/2025 COT - HCPL - Plumbing Intermediate N/A Partial Pass 9-23-25: drywall nail inspection approved. Okay for tape & texture
07/30/2025 COT - HCEL - Electrical Intermediate N/A Partial Pass 7/30/25: Electrical intermediate in wall approved ok to proceed with drywall. Pending New panels being made up
07/30/2025 COT - HCEL - Electrical Above Ceiling N/A Partial Pass
07/08/2026 COT - FCON - Sprinkler - Final N/A Deferred

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0924-01869
Permit Description: Tenant Improvement of existing market into mixed use food hall and market.
Total Completed Inspections - 28
Date Description Inspector Results Comments
05/08/2025 COT - HCPL - Rough Soil Passed Approved okay to backfill. Shading required. 5/8/2025
06/23/2025 COT - HCBU - Excavation/Rebar/Zoning Passed Interior pier footings for future plant. OK to place concrete in progress area.
07/30/2025 COT - HCEL - Electrical Underground Passed
04/01/2026 COT - BULD - SWG Clearance Passed
04/01/2026 COT - HCPL - Gas Pressure Test Passed
06/15/2026 COT - FCON - Alarm - Final Passed
06/15/2026 COT - FCON - Hood System - Final Passed
06/23/2026 TRSP - ROW - Final/Close-Out Passed
06/23/2026 COT - HCEL - Electrical Final Passed
06/30/2026 COT - FCON - Fire - Final Passed
07/07/2026 COT - LCBU - Building Final Passed
07/07/2026 COT - HCPL - Plumbing Final Passed
07/07/2026 COT - HCPL - Plumbing Above Ceiling Passed
07/07/2026 COT - HCPL - Gas Final Passed
07/07/2026 COT - HCME - Venting Passed
07/07/2026 COT - HCME - Mechanical Final Passed
07/07/2026 COT - HCME - Mechanical Above Ceiling Passed
07/07/2026 COT - HCEL - Outdoor Lighting Passed
07/07/2026 COT - HCEL - Grounding/Bonding Passed
07/07/2026 COT - HCBU - Framing Passed
07/07/2026 COT - HCBU - CofO Passed
07/07/2026 ENGR Engineering Final Passed
07/07/2026 COT - HCPL - Plumbing Intermediate Passed
07/07/2026 COT - HCME - Mechanical Intermediate Passed
07/07/2026 COT - HCEL - Electrical Intermediate Passed
07/07/2026 COT - HCEL - Electrical Above Ceiling Passed
07/07/2026 COT - HCBU - Building Final Passed
07/09/2026 COT - HCME - Kitchen Hood Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
GIBSON FOOD HALL REPORT PACKET-2026-06-22_V2.PDF DOCUMENTS VIEW
JOHHNYGIBSONMARKET_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTIONS 11 6TH-2026-07-01_V1.PDF DOCUMENTS VIEW
FOR RECORDS JOHHNYGIBSONMARKET_V1.PDF DOCUMENTS VIEW
INT SIC GIBSON FOOD HALL REPORT PACKET-2026-06-22_V2.PDF DOCUMENTS VIEW
2_PIMA COUNTY SEWER CONNECTION PERMIT_V1.PDF DOCUMENTS VIEW
2_SPECIAL INSPECTIONS CERTIFICATE-2025-01-10_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV2_2_PLAN SET_V3.PDF DOCUMENTS VIEW
REV2_2_CALCULATIONS_V1.PDF DOCUMENTS VIEW
REV2_2_SYSTEM DESIGN REPORT_V1.PDF DOCUMENTS VIEW