Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0924-01869
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/16/2024 | Site Zoning | APPROVED | |||
12/16/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
12/02/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer (from previous submittal TUC9604001.093024) Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 10/15/2024 10:09:32 PM Building(B) Reviewer Janet Matz jmatz@safebuilt.com Approved with Comments Reason: Date Completed : 11/28/2024 1:14:13 AM Provide a copy of the statement of Special Inspection Services forms that are completed, and signed and sealed by the project design engineer Mechanical(M) Reviewer Julio E. Gonzalez julio@mtcinspectors.com Approved Reason: Date Completed : 11/25/2024 6:35:20 PM Electrical(E) Reviewer (from previous submittal TUC9604001.093024) Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 10/2/2024 11:29:19 AM 1. E4.1 has error in Load Summary (277/480V) which should be (120/208V). Correct loads in amps calculated. 2. E4.1 has error in Electrical Single Line Diagram short circuit label above Panel A which is shown as F2 when it should be F3. 3. E4.2 panel schedule for L2 shows panels C and D added to load, but Sheet E4.1 Single Line shows as Panels A and B added. Should correct/coordinate for construction set 4. E4.2 panel schedule for K1 shows panels A and B added to load, but Sheet E4.1 Single Line shows as Panels C and D added. Should correct/coordinate for construction set. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 11/28/2024 2:33:37 PM Second Plumbing Review: comments 2 & 3 remain Resolved_1). Plan Page P1.2: Missing Gas system Legnth. Add gas system legnth to correlate with the gas sizing table listed. -2018 IFGC 402.3 Unresolved-2). Plan Page P1.0: To many items connected to Hydromechanical Grease interceptor. Per Tucson Plbg Code amendments only 4 items allowed to be connected to the hydromechanical grease interceptor. (Plans show 17 items in total new & existing see grease sizing table) Unresolved-3). General: Plumbing plans missing Drinking fountain & mop sink that are listed on plan page G1.1. Show all the required plumbing fixtures & their illustrations to the plumbing plans. -2018 IPC 403.1 (still need to show locations of mop sink & existing bottle filler/drinking fountain) |
||
12/05/2024 | Fire New Construction | REVIEW COMPLETED | |||
11/22/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |