Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0924-01869
Parcel: 117061910

Address:
11 S 6TH AV

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0924-01869
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/28/2024 Site Engineering NOT REQUIRED
10/28/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
10/16/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 10/15/2024 10:09:32 PM






Building(B) Reviewer
Janet Matz
jmatz@safebuilt.com
Denied
Reason:
Date Completed : 10/15/2024 1:12:40 AM
RESUBMITTAL DIRECTIONS: All corrections must be clouded, delta numbered, with a brief explanation within the plan sheet or the title block of the sheet. Please include with the resubmittal a separate response narrative, which is numbered or
itemized to correspond to each of the noted plan review comments items.
1. Sheet G1.0 (Code Analysis). Note the Alteration Level per the Classification of Work per Section 601 of the 2018 International Existing Building Code on the drawings.
2. Sheet G1.0 (Life Safety Plan). Clarify the type of door that is indicated as existing on the east side of the building near to ramp that will serve as an exit into the outside courtyard. As drawn, this appears to be a sliding type, or folding door. 2018 IBC Section 1010.1.4.
3. Sheet G1.0 (Life Safety Plan). The exit door to the east goes directly into a courtyard that appears to have a fence and gate at the side facing Arizona Ave. The exit discharge shall provide a direct and unobstructed access to a public
way. Show the courtyard and the exit and required opening width out to the public way on the plan. Include in the occupancy count any customer seating that will be in this area. 2018 IBC Section 1028.5.
4. Sheet G1.0 and Sheet G1.2 (Life Safety Plans). Show the location of the exit signage on the life safety drawings that coordinates with the exit paths. 2018 IBC Section 1013.
5. Sheet G1.0 and Sheet G1.2 (Life Safety Plans). Show the location of the emergency lighting with battery backup fixtures including the fixture on the exterior of the doors that will illuminate the exterior landings. 2018 IBC Section
1008.3.2.
6. Sheet A2.0 (Floor Plan). Provide construction details for the new wood steps to be provided in the bakery area including tread and riser information and clear width. 2018 IBC Section 1011.
7. Sheet A2.1 (Floor Plan). The floor plan notes number 7 indicates a new wood guardrail to be installed in the mezzanine. Provide details for this guardrail including attachment requirements, overall height and balusters. 2018 IBC Section 1015.
8. Sheet A2.5 (Finish Schedule). Note on the Room Finish Schedule that all interior finishes will be in accordance with 2018 IBC Sec. 803.1.








Mechanical(M) Reviewer
Julio E. Gonzalez
julio@mtcinspectors.com
Denied
Reason:
Date Completed : 10/4/2024 3:40:30 PM
Rejection comments:
Per IMC 2018, section 312.1 provide Load Calculations per for new equipment and occupancy. Per IMC 2018, section 301.15 Wind Resistance provide roof equipment tie-down detail and coordinate with project Structural Engineer.






Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 10/2/2024 11:29:19 AM
1. E4.1 has error in Load Summary (277/480V) which should be (120/208V). Correct loads in amps calculated.
2. E4.1 has error in Electrical Single Line Diagram short circuit label above Panel A which is shown as F2 when it should be F3.
3. E4.2 panel schedule for L2 shows panels C and D added to load, but Sheet E4.1 Single Line shows as Panels A and B added. Should correct/coordinate for construction set
4. E4.2 panel schedule for K1 shows panels A and B added to load, but Sheet E4.1 Single Line shows as Panels C and D added. Should correct/coordinate for construction set.








Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 10/6/2024 11:33:44 PM
First Plumbing Review:
1). Plan Page P1.2: Missing Gas system Legnth. Add gas system legnth to correlate with the gas sizing table listed. -2018 IFGC 402.3
2). Plan Page P1.0: To many items connected to Hydromechanical Grease interceptor. Per Tucson Plbg Code amendments only 4 items allowed to be connected to the hydromechanical grease interceptor.
3). General: Plumbing plans missing Drinking fountain & mop sink that are listed on plan page G1.1. Show all the required plumbing & their illustrations to the plumbing plans. -2018 IPC 403.1
10/23/2024 Fire New Construction REQUIRES RESUBMIT Resolve SAFEBuilt comments.
Questions: patricia.shelton@tucsonaz.gov
10/28/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM:
Fernando Garcia
Planning & Development Services Department – Zoning Review Section

PROJECT:
TC-COM-0924-01869 – Tenant Improvement
11 S 6th Av, Tucson, AZ 85701
Plan Review (1st Review)

TRANSMITTAL DATE: October 28, 2024

This site is zoned OCR-2 (UDC Section 4.7.27). Food service (food court) is a permitted use in OCR-2 subject to use-specific standards 4.9.4.M.1., .6, & .7.

1. (Comment) Final Site Zoning approval of this plan cannot occur until Special Districts Application SD-0724-00066 is approved.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Completion of SD-0724-00066.

If you have any questions about this transmittal, please contact Fernando L. Garcia at fernando.garcia2@tucsonaz.gov.
09/30/2024 PDSD Application Completeness REVIEW COMPLETED