Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0923-02246
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/24/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/10/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 9/28/2023 3:28:33 PM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 9/28/2023 3:27:38 PM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 9/28/2023 2:00:47 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 10/5/2023 1:11:53 PM Electrical Review By: Ron Ross PE 1 E0.0 GENERAL NOTES: Sheet index missing sheet E4.1 Equipment Schedule. 3 E1.0 SITE PLAN: Missing Keynote 10. 7 E3.0 SINGLE LINE: Could not locate Keynote 2. 9 E4.1 EQUIPMENT SCHEDULE: Keynote 2 is in error for F2 as it needs a 3 pole disconnect per Volts and Wire Callout. 10 E5.0 SITE PHOTOMETRIC PLAN: Tucson City has a maximum lumens per Acre and lamp lighting cutoff requirement for exterior lighting vs the provided IECC exterior lighting comcheck which is accepted for this review. However, the web URL to reference the proper calculations and table are in Chapter 4: https://www.tucsonaz.gov/files/sharedassets/public/v/1/cityservices/planning-development-services/documents/2012_outdoor_lighting_code_.pdf Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 10/8/2023 5:39:55 PM First Plumbing Review: 1). Water piping & water piping fittings on plan page P1.3 are not compatible. & doesn't correlate with water piping materials on plan page P1.2 -IPC 605 2). Carwash water connection on plan page P1..2 needs RPZ Backflow preventer. -IPC 608 3). Storm drain calculation table on P1.1 is using the incorrect rainfall rate -Tucson Plumbing Code Amendments. 4). Horizontal portion of 3" roof drain conductors on P1.1 will need 1/4" slope -IPC 1106.2 5)., Plumbing plan & floor plan not clear where the 2 washing machines are located and where they connects to the sanitary & water piping systems. They will need to discharge thru a lint interceptor. - IPC 106.3.1, 1003.6 ( 2 clothes washers are listed on plan page P1.1 Waste water calculations) 6). Plan set missing Pages C4.1, 4.2, 4.3 for continuation of water service & sewer as stated throughout plumbing pages. - IPC 106.3.1 |
||
10/18/2023 | Site Engineering | REQUIRES RESUBMIT | See Zoning comment | ||
10/13/2023 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0923-02246 4975 E. Benson Hy. – PAD-21 Automotive Washing - Self Service (1st Review) TRANSMITTAL: October 13, 2023 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in PAD-21 (UDC 4.7.24), Automotive Washing - Self Service is a permitted use in the PAD. 1. As development package (DP), TD-DEV-0923-00401, has not completed its 1st review Zoning is not able to review the building permit for compliance with the DP and will review on the next submittal. Zoning cannot approve the building plans until the DP is approved by all review agencies. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
10/24/2023 | Water - PDSD | REQUIRES RESUBMIT | Provide the civil plans showing the installation of the water service to the building and the installation of the building sewer as part of the building plan set. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Reference: Sections 107.2.1 and 107.2.6, IBC 2018. | ||
10/19/2023 | Fire New Construction | REVIEW COMPLETED | |||
09/22/2023 | PDSD Application Completeness | REVIEW COMPLETED |