Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0923-02246
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/06/2025 | Commercial Electrical | APPROVED | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 1/6/2025 10:41:10 AM 1. E2.0 could not locate added Power Keynotes 12 and 13. |
||
| 01/06/2025 | Commercial Mechanical | APPROVED | Mechanical(M) Reviewer (from previous submittal TUC9402002.123124) Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 1/6/2025 11:07:32 AM |
||
| 01/06/2025 | Commercial Plumbing | APPROVED | Plumbing(P) Reviewer (from previous submittal TUC9402002.123124) Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 1/5/2025 9:28:21 PM Revised Plan Plumbing Review: OK |
||
| 01/21/2025 | Water - PDSD | APPROVED | |||
| 01/23/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/06/2025 | Commercial Building | REQUIRES RESUBMIT | Structural(S) Reviewer (from previous submittal TUC9402002.123124) Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 1/6/2025 11:20:08 AM 1. SHEET S1.3 - MISSING DIMENSIONS: Revisions to the knife wall on Foundation Plan S2.0, Gridline B have made it necessary to introduce a new cast-in-place concrete beam and pilaster to support the double wythe CMU wall between Gridlines 4 and 5. Details for this beam and pilaster are included on Sheet S1.3. However, the details do not appear to include dimensions showing the overall beam depth or plan dimensions for the proposed pilaster. Please revise Details 11 & 17/S1.3 to include dimensions for all structural elements. 2. SHEET S2.0 - NEW STEEL ELEMENTS: Revisions to the east and west entryways on Foundation and Main Roof Framing Plans have introduced new spread footings, steel columns and beams that are not identified on plan. A callout refers to Sheet S4.2 for an enlarged plan of the west entry, however, Sheet S4.2 was not submitted as part of the revised construction documents. Please confirm where information on the eight new columns, beams and footings have been provided and revise the plan callout if Sheet S4.2 is no longer part of this set. 3. SHEET S4.0 - CONFIRM DESIGN: Revisions to Details 3 & 5 on Sheet S4.0 have changed the way a steel ledger supporting metal deck is fastened to the CMU wall. Where previously, anchor bolts were installed at 2'-0" oc. along the length of the ledger, the revised details show embed plates to be installed within 8" of the end of each ledger. No intermediate spacing has been indicated. Please confirm that the design intent is for the ledger to be supported at either end and has been designed to span between these points for the full length of the wall. Building(B) Reviewer (from previous submittal TUC9402002.123124) Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 1/5/2025 1:49:16 AM |
||
| 01/23/2025 | Site Engineering | REQUIRES RESUBMIT | see zoning comments | ||
| 01/21/2025 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0923-02246 - TD-DEV-0923-00401 5075 E VALENCIA RD. – PAD-21 Automotive Washing - Self Service (2nd Review) TRANSMITTAL: January 21, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in PAD-21 (UDC 4.7.24) Automotive Washing - Self Service is an allowed use in the PAD. 1. Zoning has reviewed the building plans for compliance with development package (DP), TD-DEV-0923-00401, and the following comments need to be addressed. 2. The gross building area, 4620 and proposed gross floor area 4,609 do not match what is shown on the DP, 4,226. Either the building plan or the DP will need to be revised so that the floor area match. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 01/03/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |