Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0923-02246
Parcel: 14036349A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0923-02246
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2025 Commercial Electrical APPROVED Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 1/6/2025 10:41:10 AM
1. E2.0 could not locate added Power Keynotes 12 and 13.
01/06/2025 Commercial Mechanical APPROVED Mechanical(M) Reviewer (from previous submittal TUC9402002.123124)
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 1/6/2025 11:07:32 AM
01/06/2025 Commercial Plumbing APPROVED Plumbing(P) Reviewer (from previous submittal TUC9402002.123124)
Perry Hendershott
phendershott@safebuilt.com
Approved
Reason:
Date Completed : 1/5/2025 9:28:21 PM
Revised Plan Plumbing Review: OK
01/21/2025 Water - PDSD APPROVED
01/23/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/06/2025 Commercial Building REQUIRES RESUBMIT Structural(S) Reviewer (from previous submittal TUC9402002.123124)
Madeline Nelson
mnelson@safebuilt.com
Denied
Reason:
Date Completed : 1/6/2025 11:20:08 AM
1. SHEET S1.3 - MISSING DIMENSIONS: Revisions to the knife wall on Foundation Plan S2.0, Gridline B have made it necessary to introduce a new cast-in-place concrete beam and pilaster to support the double wythe CMU wall between Gridlines 4 and 5. Details for this beam and pilaster are included on Sheet S1.3. However, the details do not
appear to include dimensions showing the overall beam depth or plan dimensions for the proposed pilaster. Please revise Details 11 & 17/S1.3 to include dimensions for all structural elements.
2. SHEET S2.0 - NEW STEEL ELEMENTS: Revisions to the east and west entryways on Foundation and Main Roof Framing Plans have introduced new spread footings, steel columns and beams that are not identified on plan. A callout refers to Sheet S4.2 for an enlarged plan of the west entry, however, Sheet S4.2 was not submitted as part of the revised construction documents. Please confirm where information on the eight new columns, beams and footings have been provided and revise the plan callout if Sheet S4.2 is no longer part of this set.
3. SHEET S4.0 - CONFIRM DESIGN: Revisions to Details 3 & 5 on Sheet S4.0 have changed the way a steel ledger supporting metal deck is fastened to the CMU wall. Where previously, anchor bolts were installed at 2'-0" oc. along the
length of the ledger, the revised details show embed plates to be installed within 8" of the end of each ledger. No intermediate spacing has been indicated. Please confirm that the design intent is for the ledger to be supported at either end and has been designed to span between these points for the full length of the wall.




Building(B) Reviewer (from previous submittal TUC9402002.123124)
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 1/5/2025 1:49:16 AM
01/23/2025 Site Engineering REQUIRES RESUBMIT see zoning comments
01/21/2025 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
TC-COM-0923-02246 - TD-DEV-0923-00401
5075 E VALENCIA RD. – PAD-21
Automotive Washing - Self Service (2nd Review)

TRANSMITTAL: January 21, 2025

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in PAD-21 (UDC 4.7.24) Automotive Washing - Self Service is an allowed use in the PAD.

1. Zoning has reviewed the building plans for compliance with development package (DP), TD-DEV-0923-00401, and the following comments need to be addressed.

2. The gross building area, 4620 and proposed gross floor area 4,609 do not match what is shown on the DP, 4,226. Either the building plan or the DP will need to be revised so that the floor area match.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
01/03/2025 PDSD Application Completeness Express REVIEW COMPLETED