Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0923-02223
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/03/2023 Site Zoning APPROVED
10/18/2023 Water - PDSD APPROVED
10/13/2023 Site Engineering NOT REQUIRED
10/18/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/28/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 9/28/2023 4:50:53 PM
See the building review comments.




Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 9/28/2023 4:49:26 PM
1) Sheet A0.0 (Cover Sheet): Include the allowed and actual area, height, and number of stories per 2018 IBC Chapter 5.

2) Sheet A1.0 (Floor Plan) and A5.0 (Accessibility Details): Show the accessibility details for the toilet/shower room and the locker room. (2009 ICC A117.1 sections 603 through 608, 803)

3) Sheet A1.0 (Floor Plan): Identify the men's and women's toilet rooms. Include the location and details of the accessibility signage. (2009 ICC A117.1 section 703)

4) Sheet A5.0 (Accessibility Details): Detail #10 - The signs are to be a minimum of 48" and a maximum of 60" above the floor, not only a maximum of 48". (2009 ICC A117.1 section 703.3.10) Detail #7 - The high drinking fountain is to be located
between 38" and 43" above the floor, not only a maximum of 43". (2009 ICC A117.1 figure 602.5)

5) Sheet P3.0 (Plumbing Schedules): The water heater is shown being 208V but the electrical plans show the main electrical service is 120/240V. Please coordinate the details. (2018 IBC section 107)

6) Sheet E1.0 (Electrical Plans): Show the power and disconnect for the water heater. (2017 NEC section 422.30)



Mechanical(M) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 9/28/2023 4:50:19 PM
See the building review comments.



Electrical(E) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 9/28/2023 4:50:04 PM
See the building review comments.



Plumbing(P) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 9/28/2023 4:50:36 PM
See the building review comments.
10/06/2023 Fire New Construction REVIEW COMPLETED
09/19/2023 PDSD Application Completeness Express REVIEW COMPLETED