Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-0923-02194
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/06/2024 | Water Sterilization Report (Deferred Submittal) Express | APPROVED | |||
| 05/06/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/06/2024 | Concrete Installation Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | CONCRETE RETAINING WALLS | ||
| 05/06/2024 | Masonry Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Missing field reports for the following: - Structural Masonry - Epoxy anchor installation - Concrete Installation . Please submit the required field reports for these deferred submittal . |
||
| 05/06/2024 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | EPOXY INSTALLATIONS | ||
| 05/06/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |