Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
6221 S PALO VERDE RD
Apply Date:
09/12/2023
Applicant:
Michael Baird
Description:
Remodeling building into warehouse previously call center

Permit Reviews

Permit Number - TC-COM-0923-02194
Permit Status: Complete
Permit Description: Remodeling building into warehouse previously call center
Start Date Submittal Complete Date Status  
09/12/2023 COMMERCIAL REVIEW - FULL v.1 01/16/2024 REQUIRES RESUBMIT Review Details
01/23/2024 COMMERCIAL REVIEW - FULL v.2 01/23/2024 APPROVED Review Details
01/23/2024 RESTAMP - COMMERCIAL v.1 01/24/2024 APPROVED Review Details
02/05/2024 RESTAMP - COMMERCIAL v.1 02/05/2024 APPROVED Review Details
05/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/06/2024 REQUIRES RESUBMIT Review Details
10/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/21/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0923-02194
Permit Status: Complete
Permit Description: Remodeling building into warehouse previously call center
Date Description Comments
01/16/2024 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
01/16/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/12/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/16/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/16/2024 Masonry Inspection Report submittal review is required.
01/16/2024 Post-Installed Anchor Inspection Report is required.
01/16/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
01/16/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0923-02194
Permite Description: Remodeling building into warehouse previously call center
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
02/20/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 2/6/24: footings at loading docks per plan (reinforcement per plan) ok to pour footings at loading docks.
2/20/24: slabs at loading docks per plan ok to pour.
12/04/2024 COT - HCME - Mechanical Final N/A Not Ready 4/25/24: not ready
4/30/24: pending air balance report
12/4/24: not ready
12/04/2024 COT - HCBU - Building Final N/A Not Ready 4/25/24: not ready
4/30/24: OK FOR LEVEL 4 TCO. pending air balance report
12/4/24: not ready
COT - FCON - Fire - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0923-02194
Permit Description: Remodeling building into warehouse previously call center
Total Completed Inspections - 22
Date Description Inspector Results Comments
02/09/2024 COT - HCBU - Masonry Pregrout Passed 2/9/24: stem wall/ retaining wall per plan ok to grout.
02/09/2024 COT - HCBU - Stem Wall/Retaining Wall Passed 2/9/24: stem wall/ retaining wall per plan ok to grout.
02/20/2024 COT - HCBU - Framing Passed 2/16/24 detail 6a and 3 sheet 6 require fore blocking and sound barrier, please provide per detail or RFI
2/20/24: RFI provided by engineer regarding discrepancy of fire blocking. Sound barrier will need to be installed.
03/06/2024 COT - HCPL - Plumbing Intermediate Passed
03/06/2024 COT - HCPL - Plumbing Above Ceiling Passed
03/27/2024 BULD - Electrical Clearance Passed 3/27/24: INCR for 6221 S PALO VERDE RD NORTH METER 1 and 6221 S PALO VERDE RD SOUTH METER 2
04/10/2024 COT - HCBU - Building Above Ceiling Passed
04/10/2024 COT - HCEL - Electrical Intermediate Passed
04/10/2024 COT - HCME - Mechanical Above Ceiling Passed
04/10/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
04/10/2024 COT - HCBU - Preslab Passed
04/10/2024 COT - HCEL - Electrical Above Ceiling Passed
04/10/2024 COT - HCME - Mechanical Intermediate Passed
04/25/2024 TRSP - ROW - Final/Close-Out Passed
04/25/2024 COT - HCEL - Electrical Final Passed
04/29/2024 COT - FCON - Alarm - Final Passed
04/29/2024 COT - FCON - Sprinkler - Final Passed
04/30/2024 COT - HCPL - Plumbing Final Passed
12/06/2024 ENGR Engineering Final Passed 2 truck in ground loading docs were looked at. No Issues, CO Ready
12/17/2024 COT - HCME - Mechanical Final Passed
12/17/2024 COT - HCBU - Building Final Passed
12/18/2024 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
BRODERICK ENGINEERING SI REPORT 1 2-06-24_V1.PDF DOCUMENTS VIEW
BRODERICK ENGINEERING SI REPORT 2 2-09-24_V1.PDF DOCUMENTS VIEW
BRODERICK ENGINEERING SI REPORT 3 2-20-24_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERTIFICATE DOUBLE SEAL-2024-10-15_V2.PDF DOCUMENTS VIEW
TEST AND BALANCE REPORT SERVPRO_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
2_A-1 THRU E4.0 SERVPRO TI 6221 S PALO VERDE OFFICE WAREHOUSE_01-08-24_D1_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_CALCS_STRUCT_V1.PDF DOCUMENTS VIEW
STANTEC_SPEC_INSP_CERT-2024-01-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_A-1 THRU E4.0 SERVPRO TI 6221 S PALO VERDE OFFICE WAREHOUSE_01-08-24_D1_V1.PDF DOCUMENTS VIEW