Permit: TC-COM-0923-02194
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
6221 S PALO VERDE RD
Address NEW:
6221 S PALO VERDE RD
Apply Date:
09/12/2023
Applicant:
Michael Baird
Description:
Remodeling building into warehouse previously call center
Permit Reviews
Permit Number - TC-COM-0923-02194
Permit Status: Complete
Permit Description: Remodeling building into warehouse
previously call center
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/12/2023 | COMMERCIAL REVIEW - FULL v.1 | 01/16/2024 | REQUIRES RESUBMIT |
| 01/23/2024 | COMMERCIAL REVIEW - FULL v.2 | 01/23/2024 | APPROVED |
| 01/23/2024 | RESTAMP - COMMERCIAL v.1 | 01/24/2024 | APPROVED |
| 02/05/2024 | RESTAMP - COMMERCIAL v.1 | 02/05/2024 | APPROVED |
| 05/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/06/2024 | REQUIRES RESUBMIT |
| 10/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/21/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0923-02194
Permit Status: Complete
Permit Description: Remodeling building into warehouse
previously call center
| Date | Description | Comments |
|---|---|---|
| 01/16/2024 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 01/16/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/12/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 01/16/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/16/2024 | Masonry Inspection Report submittal review is required. | |
| 01/16/2024 | Post-Installed Anchor Inspection Report is required. | |
| 01/16/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 01/16/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0923-02194
Permite Description: Remodeling building into warehouse
previously call center
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 2/6/24: footings at loading docks per plan (reinforcement per plan) ok to pour footings at loading docks. 2/20/24: slabs at loading docks per plan ok to pour. |
| 12/04/2024 | COT - HCME - Mechanical Final | N/A | Not Ready | 4/25/24: not ready 4/30/24: pending air balance report 12/4/24: not ready |
| 12/04/2024 | COT - HCBU - Building Final | N/A | Not Ready | 4/25/24: not ready 4/30/24: OK FOR LEVEL 4 TCO. pending air balance report 12/4/24: not ready |
| COT - FCON - Fire - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0923-02194
Permit Description: Remodeling building into warehouse
previously call center
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2024 | COT - HCBU - Masonry Pregrout | Passed | 2/9/24: stem wall/ retaining wall per plan ok to grout. | |
| 02/09/2024 | COT - HCBU - Stem Wall/Retaining Wall | Passed | 2/9/24: stem wall/ retaining wall per plan ok to grout. | |
| 02/20/2024 | COT - HCBU - Framing | Passed | 2/16/24 detail 6a and 3 sheet 6 require fore blocking and sound barrier, please provide per detail or RFI 2/20/24: RFI provided by engineer regarding discrepancy of fire blocking. Sound barrier will need to be installed. |
|
| 03/06/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 03/06/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 03/27/2024 | BULD - Electrical Clearance | Passed | 3/27/24: INCR for 6221 S PALO VERDE RD NORTH METER 1 and 6221 S PALO VERDE RD SOUTH METER 2 | |
| 04/10/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
| 04/10/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 04/10/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 04/10/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 04/10/2024 | COT - HCBU - Preslab | Passed | ||
| 04/10/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 04/10/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 04/25/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/25/2024 | COT - HCEL - Electrical Final | Passed | ||
| 04/29/2024 | COT - FCON - Alarm - Final | Passed | ||
| 04/29/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 04/30/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 12/06/2024 | ENGR Engineering Final | Passed | 2 truck in ground loading docs were looked at. No Issues, CO Ready | |
| 12/17/2024 | COT - HCME - Mechanical Final | Passed | ||
| 12/17/2024 | COT - HCBU - Building Final | Passed | ||
| 12/18/2024 | COT - FCON - Fire - Final | Passed |