Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0923-02168
Parcel: 117042710

Address:
221 E 6TH ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0923-02168
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/02/2023 External Reviewers - Stantec APPROVED
10/23/2023 Water - PDSD APPROVED
10/18/2023 Site Engineering NOT REQUIRED
11/02/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/26/2023 Site Zoning REQUIRES RESUBMIT CDRC Transmittal

FROM: Loran Shamis, MBA; Lead Planner
PDSD Zoning Review Section

PROJECT: TC-COM-0923-02168 – Downtown Dispensary
Tenant Improvement - waiting room expansion (1st review)
221 E 6th St

TRANSMITTAL DATE: October 26, 2023
DUE DATE: October 21, 2023

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

01. COMMENT: Demonstrate compliance with 4.9.9.E.1.I, Odor Mitigation.

(1) Odor mitigation devices and techniques shall be incorporated in all marijuana facilities to ensure that odors are mitigated. As such, this may be done through an exhaust air filtration system with odor control that prevents internal odors from being emitted externally or through any other best practices deemed adequate for odor mitigation as determined by the Zoning Administrator.

(2) An odor mitigation plan shall be submitted demonstrating compliance with odor control requirements. When a modification is made to a marijuana facility, or the facility operation, that has the potential to impact the nature or degree of odor, or affects the control of odor, and UDC requirements for bringing the entire site up to code per Sections 7.4.3.E, 7.5.3.E, 7.6.2.B & 9.2.2, the marijuana facility owner must update its odor mitigation plan within 30 days of facility modification. Failure to submit an updated odor mitigation plan within 30 days of facility modification is a violation of this section and shall be a civil infraction.

(3) Upon receipt of a formal complaint through code enforcement related to a marijuana facility's odor, an inspection for compliance with the odor mitigation plan shall be conducted. If an inspection reveals that the existing odor mitigation plan does not comply with the odor mitigation plan for the marijuana facility or marijuana facility's cultivation site , code enforcement shall provide the owner or person in charge with a notice of deficiencies and the owner or person in charge will be required to bring facility into compliance with the approved odor mitigation plan.

For questions regarding Zoning comments, please contact me at: Loran.Shamis@tucsonaz.gov
10/19/2023 Fire New Construction REVIEW COMPLETED
09/21/2023 PDSD Application Completeness Express REVIEW COMPLETED