Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0826-01393
Parcel: 14043013B

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0826-01393
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/15/2026 Outdoor Lighting Standard APPROVED
09/14/2026 Site Engineering Standard APPROVED
09/21/2026 Site Zoning Standard APPROVED
09/21/2026 Water - PDSD Standard APPROVED
09/23/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/31/2026 Addressing Validation REQUIRES RESUBMIT If you have any questions about this review, please contact CDRC@tucsonaz.gov
Plans are missing unit number. Please add unit number to the plans address and resubmit.
Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf
09/23/2026 Commercial Building Standard REQUIRES RESUBMIT 1. Sheet G0.0; For questions regarding Plan Review comments please contact: Dino M. Accardo, MCP, CBO, E: daccardo@willdan.com. MEP, Structural, Fire Plan Review, Civil Engineering and Planning/Zoning are NOT within the scope of this review. All applicable comments will be followed with the initials, DMA.
2. Sheet G0.0, 2024 IBC 306.1 Factory Industrial Group F. Factory Industrial Group F occupancy includes, among others, the use of a building or structure, or a portion thereof, for assembling, disassembling, fabricating, finishing, manufacturing, packaging, repair or processing operations that are not classified as a Group H hazardous or Group S storage occupancy. Provide a detailed narrative describing operation and function of the spaces throughout the facility. A proposed cover all B occupancy may not be applicable to the actual function and use of this facility. DMA
3. Sheet G0.0; Plans include equipment "by others". This equipment will require either deferred submittal or listed as a separate permit on the plans. The scale and impact of this equipment must be considered, not only being integral into the operation/s, but also the equipment specification and installation instructions are subject to review. DMA
4. Sheet G1.0, 2024 IBC 504 height and number of stories. I dentify the height and number of stories for building. DMA
5. Sheet C1.0, 2024 IBC Table 602; Provide dimensioned distance between new structure and existing structures identified as 848 and 930. DMA
6. Sheet A5.1B; Walls will be subject to review based upon review comment related to occupancy classification and the forthcoming operational narrative. NOTE: Although identified as a non-separated design, this comment is a place holder for the review to ensure compliance and the review is holistic. DMA
7. Sheet A5.1C, 2024 IBC 719 and 803. Rfoil materials must comply flame spread and smoked developed requirements. NOTE: Structure is proposed as a IIB structure. DMA
8. Sheet A5.4C, 2024 IBC 1011.6; Ships ladder are not listed within the exceptions found within this section. DMA
9. 1704 Submit completed special inspections forms for the geotechnical and structural inpsections.
10. 1704 Submit completed special inspection form
09/23/2026 Commercial Electrical Standard REQUIRES RESUBMIT 1. Plans do not include a Building Envelope Energy Certificate
09/23/2026 Commercial Mechanical Standard REQUIRES RESUBMIT 1. Page M0.0 (1 of 87) of the MPE pages. Please add the following note: Per the of Tucson Amendment to the 2024 IMC Section 608.1 Ventilation systems shall be balanced by individuals holding current certification from the Associated Air Balance Council (AABC), the National Environmental Balancing Bureau (NEBB) or other approved agencies. Final reports shall be provided to the engineer of record and the code official prior to the issuance of a certificate of occupancy. Tom Paradise 602-980-3887 tparadise@willdan.com
09/23/2026 Commercial Plumbing Standard REQUIRES RESUBMIT 1. Page A1.R (40 of 108) of Cons-Part 1 Please comply with Scupper Details on Page A5.3B (57 of 108) 18 inches wide OR Revise this table to show that the minimum width of the scupper is equal to or greater than the circumference of a roof drain sized for the same roof area. 2024 IPC Section 1106.5 Tom Paradise 602-980-3887
09/22/2026 Fire New Construction Standard REVIEW COMPLETED
08/31/2026 PDSD Application Completeness Express REVIEW COMPLETED