Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0825-01557
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/21/2025 | Commercial Electrical Standard | APPROVED | |||
| 11/03/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/03/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. New Comments from the Second review 11/3/2025 11. Please indicate the total square footage of occupied space associated with this permit, as this information is required for the completion of the C of O. IBC 107.2.1 12. Please show the required handrails, on both sides of the ramp, where the total rise is greater than 6 inches. IBC 1012.8 Please ensure the handrails are shown in compliance with IBC Section 1014 For example, height, graspability, and extensions Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 11/03/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0825-01557 ADDRESS/PARCEL: (4443 E SPEEDWAY BL TUCSON, AZ 85712) COMMENTS 1. The existing gas piping (section #30 on Sheet P1.0) appears to be undersized per 2018 IFGC Table 402.4(2). This section now has a demand of 325 CFH, and based on the developed length from the meter, the pipe size should be 1 ½ inches. Please resolve. |
||
| 11/03/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 10/13/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |