Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0824-01558
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/21/2024 | Commercial Electrical | APPROVED | |||
08/23/2024 | Commercial Plumbing | APPROVED | |||
08/23/2024 | Site Zoning | APPROVED | |||
08/27/2024 | Site Engineering | NOT REQUIRED | |||
08/27/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/23/2024 | Commercial Building | REQUIRES RESUBMIT | Sheet A1; For questions regarding Plan Review comments please contact: Dino M. Accardo, MCP, CBO, E: daccardo@willdan.com. Fire Plan Review is NOT within the scope of this review. All applicable comments will be followed with the initials, DMA. 1. Sheet A1, 2018 IBC 1104.1 Site arrival points. At least one accessible route within the site shall be provided from public transportation stops, accessible parking, accessible passenger loading zones, and public streets or sidewalks to the accessible building entrance served. Provide a Site Plan (2018 IBC 107.2.6) that details requirements. DMA 2. Sheet A6, 2018 IBC 1105.1 Public entrances. In addition to accessible entrances required by Sections 1105.1.1 through 1105.1.7, at least 60 percent of all public entrances shall be accessible. Provide details to demonstrate compliance with this section. DMA |
||
08/23/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Sheet M2, 2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. Provide an Outdoor Air Calc. DMA 2. Sheet M2, 2018 IMC; Provide manufacturer specifications and installation instructions for multi-split system. DMA |
||
08/22/2024 | Fire New Construction | REVIEW COMPLETED | |||
08/09/2024 | PDSD Application Completeness | REVIEW COMPLETED |