Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0823-01995
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/22/2023 | Site Zoning | APPROVED | |||
09/15/2023 | Water - PDSD | APPROVED | |||
08/23/2023 | Site Engineering | NOT REQUIRED | |||
09/15/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/18/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/18/2023 4:09:27 PM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/18/2023 4:07:47 PM 1) General: Please provide proof of project valuation. 2) General: Include the specification sheets for the oven to determine if a hood is needed. (2018 IMC section 507.3) 3) Sheet A0.9 (Cover Sheet): The occupancy load for commercial kitchens is calculated at 1 person per 200 sf. (2017 NEC Table 1004.5) 4) Sheet A2.8 (First Floor Plan): Show the entire floor and the uses of the spaces to determine if fire separation is needed per Table 508.4. Detail if dining areas are new or existing. (2018 IBC section 107) 5) Sheets A2.8, A8.9, P1.0, P2.0, E2.1, and E4.1: Plumbing fixtures and equipment (espresso machines, ice machines, and hand sink) shown on the floor plans do not match what is shown on the plumbing and electrical pages. If additional kitchen equipment (shown on the plumbing plans) is installed, the electrical panel may not be large enough. Please coordinate the plans and revise all applicable sheets. (2018 IBC section 107) 6) Sheet E4.1 (Electrical Panel Schedules): The panel schedule for panel "G" circuits 37, 39, and 41 show they are feeding panel "B1", but the new subpanel is named "G1". (2017 NEC sections 110.22 and 408.4) Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/18/2023 4:08:53 PM See the building review comments. Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/18/2023 4:08:33 PM See the building review comments. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/18/2023 4:09:10 PM See the building review comments. |
||
08/16/2023 | Fire New Construction | REVIEW COMPLETED | |||
08/16/2023 | PDSD Application Completeness | REVIEW COMPLETED |