Permit Number: TC-COM-0823-01930
Parcel: 132130260

Address:
1501 E METRIC PL

Review Status: Approved

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0823-01930
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
11/15/2023 Bldg Permits - Post Review Express REVIEW COMPLETED
11/15/2023 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved with Comments
Reason:
Date Completed : 11/12/2023 7:41:57 PM
1. S1.1 - SLAB-ON-GRADE REINFORCEMENT: Please review the selected reinforcement for the 6" thick concrete slab called out in Foundation Plan Note #2. #4 bars at 24"oc does not satisfy the minimum ratio of reinforcement to gross concrete area specified in ACI 318, Section 24.4.3.2 for shrinkage and temperature reinforcement. Please modify the reinforcement called out to meet the minimum ratio of 0.0018 for Grade 60 deformed bars. See also Details 315 and 316 for additional locations.

2. S1.1 - MISSING INFORMATION: Please provide the typical size and spacing of reinforcement in the Office Area per Foundation Plan Note #9.



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 11/1/2023 11:11:11 AM



Mechanical(M) Reviewer
Neil Samaan
nsamaan@safebuilt.com
Approved with Comments
Reason:
Date Completed : 8/13/2023 9:36:47 PM
Approved/subject to field approval
for offices and the storage room #101only the rest of facility is not in the scope of the mechanical review the only mechanical submitted for review is the offices and storage room #101



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved
Reason:
Date Completed : 10/31/2023 5:07:49 PM



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Approved with Comments
Reason:
Date Completed : 11/5/2023 3:55:33 PM
Second Plumbing Review: OK Subject to Field inspections
1). Resolved-Need to address Building plan review comment #8 -IPC 403.1

2). Resolved-Add gutter & downspout sizing calculations to plan page A1.6 -IPC 1106.3, 1106.6

3). Resolved-Floor sinks on plan page P1.0 can't be located at the exterior. - IPC 1101.3

4). OK Subject to Field inspections-Ice machine floor sink missing from sanitary riser on plan P1.0 - IPC 106.3.1

5). Resolved-Hose bibs need individual shut off valves on plan pages P1.1 & P2.1 -IPC 606.2

6).Resolved- label the hot return line on plan pages P0.0, P1.1, P2.1 -IPC 106.3.1, 607.2

7). Resolved-This occupancy type & load requires a high/low drinking fountain -IPC 403.1

8). OK Subject to Field inspections-Notes 1 & 2 on plan page P2.1 don't correlate to the riser diagram? -IPC 106.3.1
10/31/2023 PDSD Application Completeness Express REVIEW COMPLETED