Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0823-01886
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/08/2023 | Site Zoning | APPROVED | |||
08/08/2023 | Site Engineering | NOT REQUIRED | |||
08/17/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/17/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 8/17/2023 11:24:56 AM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 8/9/2023 11:14:14 AM 1. Sheet AD-111: The required smoke barrier is interrupted at the clean supply room. Clearly indicate the continuance of the smoke barrier. Additionally, please show that all smoke barriers meet the continuity requirements of section 709.4.1. 2. Sheet AC-012: Many of the partition types are labeled as smoke partitions. However, smoke barriers are required. Provide the proper partition type for separations requiring smoke barriers in accordance with Section 407.5. Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Conditionally Approved Reason: Date Completed : 8/6/2023 1:47:52 PM Approved/Subject to field approval Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 8/16/2023 6:23:14 PM Electrical Review of BUMCT By: Ron Ross PE ED-213 AREA C - BASEMENT FLOOR DEMO PLAN - POWER: Comment, Missing this sheet. ED-214 AREA D - BASEMENT FLOOR DEMO PLAN - POWER: Sheet is missing keyplan. E-212 AREA B - OR PLAN - POWER: Isn’t keynote 2 a duplicate of keynote 4 on Sheet E-211? Same issue with Keynotes 1 and 3. Suggest to make a standard keynote legend and state ‘Not all keynotes used’. E-801 SCHEDULES - ELECTRICAL: Need to provide interior lighting Comcheck report (Cover page(s) is acceptable) or provide a statement that fewer a Comcheck is not required as less than 10% of the lights are being replaced and the ones that are being replaced are lower wattage than existing. “Or that replaced lights are in critical areas outside the scope of Comcheck.” Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 8/16/2023 10:33:21 PM First Plumbing Review: 1). Make up water connection on plan page M-702 needs backflow preventer - IPC 608.3 2). Plumbing plans need to include sanitary, venting , water piping configurations for the new and relocated fixtures shown on plan pages P-211 & P212 -IPC 106.3.1 including new restroom 3). Plumbing plans need to show piping configuration detail for the CS-1 sink as labeled on plan page P001 -IPC 106.3.1, 608.3, 609.1 4). Add scrub sink info to plan page P001 -IPC 303 5). plumbing plans do not illustrate the backflow device as stated on plan page M-701 -IPC 608.3 |
||
08/13/2023 | Fire New Construction | REVIEW COMPLETED | |||
08/04/2023 | PDSD Application Completeness | REVIEW COMPLETED |