Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0725-01397
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/25/2025 | Outdoor Lighting Standard | APPROVED | |||
| 09/30/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/30/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Mr. Ornelas, is this permit for the swimming pool work. If it is, please submit drawings depicting the work being done on the swimming pool. NOTE: every units on this site have their own individual permits. | ||
| 09/25/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0725-01397 (1651 E GLENN ST TUCSON, AZ 85719) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. The documents provided are not scanned correctly and are not clearly legible for review or inspections. Please provide documents that are clear and legible. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 09/29/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. Comment not addressed. [Initial comment: Replacement of AC units will require heating/cooling load calculations to justify the capacities of the units being installed (Sections R403.7, IECC 2018). The units themselves will also have to comply with Sections R403.1 and R503.1.2, IECC 2018 for controls. The replacement units shall have an efficiency rating that is greater than or equal to the minimum required by the Department of Energy requirements that went into effect on January 1, 2023, for the Southwest part of the country.] 2. Comment not addressed. [Initial comment: Apply for a separate permit for each structure.] |
||
| 09/29/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Comment not addressed. [Initial comment: Apply for a separate permit for each structure.] 2. Comment not addressed. [Initial comment: The description of work for this activity is to replace a water heater. If it is a like-for-like replacement, submit documents that describe the proposed water heater (e.g., Manufacturer specifications). Reference: Section 107.2.1, IBC 2018.] |
||
| 09/30/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 09/09/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |