Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0724-01369
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/14/2024 | Site Zoning | APPROVED | |||
| 08/16/2024 | Site Engineering | NOT REQUIRED | |||
| 08/15/2024 | Water - PDSD | NOT REQUIRED | |||
| 08/16/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/08/2024 | External Reviewers - Stantec | REQUIRES RESUBMIT | July 24, 2024 1st Review Joseph Maher Jr., Architect Attn: Joseph Maher 4849 E. Scarlett Street Tucson, Arizona 85711 Re: SPANISH TRAIL CONDOS – UNIT 230 UNIT REPAIR City of Tucson Permit Number: TC-COM-0724-01369 Stantec Project Number: 185215066 Stantec File Number: TUC-24-100 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms R-2 V-B 1,420 8 No No Separate Permits: None. Deferred Submittals: None. Special Inspections: Concrete, epoxy and expansion anchors. ARCHITECTURAL COMMENTS There are no comments. STRUCTURAL COMMENTS Sheet S2.0 1. The Foundation Plan conflicts the Floor Framing Plan on Sheet S2.1. The (3) 2x4 column C2 on the foundation plan is indicated as a (2) 2x4 column on the floor framing plan. The 3x10 column C4 indicated on the foundation plan is indicated as a 3x6 column C3 on the floor framing plan. Please correlate and revise. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 08/09/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 07/17/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |