Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0723-01868
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/09/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/09/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/8/2023 5:43:11 PM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/8/2023 5:41:57 PM 1) Resolved - General: Clearly specify the building and work being applied for on the plans and detail the items that are under a separate permit. (2018 IBC section 107) 2) Unresolved - General: The structural calculations submitted are not for the proposed building (Building 5). (2018 IBC section 107) 2) Resolved - General: Provide the geotechnical engineer report that is referenced on sheets S100 and S102. (2018 IBC section 1803) 3) Resolved - Sheets G102, A102, and A901 (Toilet Room Accessibility Drawings): Show the turning space in the men's toilet room per 2009 ICC A117.1 sections 304.3.1 and 603.2. 4) Unresolved - Sheet P301 (Plumbing Calculations): Include the minimum plumbing fixture calculations based on the occupancy loads of the buildings that the toilet rooms are serving and meeting the requirements of 2018 IBC Table 1004.5 and 2018 IPC section 403 and Table 403.1. Revise all applicable pages as needed for toilet room fixtures and drinking fountains. The buildings that the toilet rooms serve are not shown as retail sales but appear to be assembly uses. Please revise the plumbing fixture and occupant load calculations and all affected sheets. 5) Unresolved - Sheet P301 (Plumbing Details): Include the details for how the water supply piping is being protected from freezing. (2018 IPC section P305.4) Insulation alone will not be enough to prevent the water in the pipes, drains, equipment and fixtures from freezing in a non-heated building. 6) Resolved - Sheet P301 (Plumbing Details): Provide the faucet details showing compliance with the automatic faucet requirements of the amended 2018 IPC sections 412.11 and 419.6. 7) Resolved - Sheet A901 details 3 and 13 (Toilet room Elevations): The urinal partitions are not shown being a minimum of 60" above the floor. (2018 IPC section 405.3.5 and 2018 IBC section 1209.3.2) Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/8/2023 5:42:40 PM See the building review comments. Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/8/2023 5:42:26 PM See the building review comments. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/8/2023 5:42:54 PM See the building review comments. |
||
| 11/07/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |