Permit Number: TC-COM-0723-01791
Parcel: 13425184A

Address:
7073 E 22ND ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0723-01791
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/29/2023 Commercial Mechanical NOT REQUIRED
08/29/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/22/2023 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response. 1 The Panel schedule for panel ‘A’ and fault current calculations were not found as indicated by the note in the Electrical Riser Diagram. 2 Provide an additional supplemental ground rod if not utilizing a ‘Concrete Encased Grounding Electrode’ per nec art 250.53. 3 Provide complete compliance with the 2012 City of Tucson Outdoor Lighting Code (OLC) for exterior lighting Lumen and Lamp color Temperature restrictions for the parcel. See Chapter 104 for Permit/Plan Submittal Requirements. Be advised that Luminaires equipped with Full Cut-off shielding as defined per OLC section 202 (Definitions) that are mounted under canopies or roof overhangs are exempt from the lumen calculations per section 401.2.1(3). However, the light source color temperature output cannot exceed 3500K, per section 402.1. Ref; 2018 IBC section 107.2.1, 2017 NEC, 2012 City of Tucson Outdoor Lighting Code.
08/29/2023 Commercial Plumbing REQUIRES RESUBMIT 1. Revise the site plan to show the location of the water meter and the route of the water service to the new kiosk. Reference: Section 107.2.1, IBC 2018.
2. Revise the site plan to show the route and location of the termination of the pumped waste line. Provide a detail of the termination. Reference: Section 107.2.1, IBC 2018.
08/29/2023 Commercial Structural REQUIRES RESUBMIT Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. 1. not used 2. Parking Stalls are taken out of commission. Please provide the parking calculation, making sure that it still complies to the required parking count. 3. Door Landing width matching door width and 44 inches length. Reflect this on your drawings. 4. Submit your Outdoor Lighting Code analysis and calculation as well as catalog cuts of light fixtures being proposed, their specification such as their lumens, color temp, full cutoff or unshielded. 5. Please specify on your roof section drawing as to the material being proposed to provide waterproofing of the concrete slab roof deck, if none...indicate it on the drawing. 6. Please resubmit.
08/23/2023 Site Engineering REQUIRES RESUBMIT The permit cannot be approved until its associated development package, TD-DEV-0723-00334, has been approved.

Lianne Evans
lianne.evans@tucsonaz.gov
08/10/2023 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
TC-COM-0723-01791
7075 E. 22nd St. – C-2
Food and Beverage Sales (1st Review)

TRANSMITTAL: August 10, 2023
This site is located in C-2 zone (UDC 4.7.21). Food and Beverage Sales: Excluding Large Retail Establishment is a permitted use in the zone, (Table 4.8-4).

1. Zoning acknowledges that development package (DP) TD-DEV-0723-00334 was submitted and rejected. Until a DP that meets the requirements is accepted and approved Zoning cannot approve this plan.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
08/29/2023 Water - PDSD REQUIRES RESUBMIT Reduced pressure backflow prevention assemblies are required to be installed in locations accessible to Tucson Water. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, https://www.tucsonaz.gov/files/sharedassets/public/city-services/tucson-water/water-quality/documents/backflow-ordinance.pdf
07/30/2023 Fire New Construction REVIEW COMPLETED
07/26/2023 PDSD Application Completeness Express REVIEW COMPLETED