Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0626-00994
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/27/2026 | Commercial Building Standard | APPROVED | |||
| 08/27/2026 | Commercial Mechanical Standard | APPROVED | |||
| 08/27/2026 | Commercial Plumbing Standard | APPROVED | |||
| 08/31/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/17/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TC-COM-0626-00994 (2nd Review) Project: 1 story type VB sprinkled Community Resource Center proposed south of the existing Salvation Army Amphi Corps building. Main programmatic elements include a commercial kitchen, MPR, and client pantry Location: 209 E YAVAPAI RD Review Date: 8/17/2026 Reviewer: John Mounsey – Engineering Associate - Site Engineering Reviewer Contact: John.Mounsey@tucsonaz.gov Related cases: TD-DEV-0526-00130 Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed to ensure final approval from Site Engineering. To help speed up your resubmittal and facilitate shorter review timelines, please include a response letter along with your updated plans and any supporting calculations. In your response letter, address each comment individually and explain what changes were made and where they can be found in the plans. Please do not mark or highlight changes in the drawings at this stage — revision markups are only used after a permit has been issued. Submit your response letter and updated plan set as two separate files. Site Engineering Review Comments: 1. Site Engineering has completed its review of the submitted building plan set and cross-referenced it against the associated Development Package. However, final approval of Commercial TC-COM-0626-00994 cannot be granted until the associated submission of the Development Package TD-DEV-0526-00130 has received full approval and has been issued. Per UDC §3.3.3.G, building permits for sites requiring a Development Package may not be issued prior to DP approval, as the building plans must be consistent with an approved site plan. Please resubmit for final approval once the Development Package has been approved and issued by all applicable reviewers. |
||
| 08/31/2026 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Jeffrey W. Cassidy, Planner Planning & Development Services Department – Current Zoning Review Section PROJECT: TC-COM-0626-00994 – Commercial – Community Resource Center ft Commercial kitchen, MPR, and client pantry 209 E YAVAPAI RD TUCSON, AZ 85705 (R-3 Zoning) Commercial Building Plan Review – 2nd Review TRANSMITTAL DATE: August 31, 2026 1. COMMENT: Zoning has completed its review of the submitted building plan set and cross-referenced it against the associated Development Package. However, final approval of Commercial Permit TC-COM-0626-00994 cannot be granted until the associated revision to Development Package TD-DEV-0526-00130 has received full approval and has been issued. Per UDC §3.3.3.G, building permits for sites requiring a Development Package may not be issued prior to DP approval, as the building plans must be consistent with an approved site plan. Please resubmit for final approval once the Development Package has been approved and issued by all applicable reviewers. For final approval, ensure the building plans match the approved DP regarding footprint, proposed height, and square footage, and that the downspout and structure drainage systems shown in the building plans are consistent with those depicted in the Development Package plan set. 2. COMMENT: Additional comments may be forthcoming on the next review based on responses to Zoning and other PDSD reviewer comments. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: 3. COMMENT: If applicable, updated commercial building permit. 4. COMMENT: Provide a detailed response letter with your submittal that clearly shows how you have addressed all Zoning comments. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home . Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/old-pdfs/double-old/resubmittals.pdf If you have any questions about this transmittal, please contact jeffrey.cassidy@tucsonaz.gov The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code . |
||
| 08/26/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 08/07/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |