Permit Number: TC-COM-0626-00871
Parcel: 123020660

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-0626-00871
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/12/2026 Commercial Electrical Express APPROVED
06/15/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/15/2026 Commercial Plumbing Express REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0626-00871
ADDRESS/PARCEL: 2304 N FORGEUS AV TUCSON, AZ 85716

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:

1. Please clarify the scope of work. The permit description indicates replacement of the existing sewer ejector station, while the plans indicate a new sewer ejector station. Reference: Section 107.2.1, IBC 2024.
2. Based on the scope of work, this does not appear to be a like-for-like replacement. Provide plans sealed by an Arizona Registrant. Reference: Section 107.1, IBC 2024 and Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304.
3. Please show the required check valve and full-open valve are installed in an accessible location above the sump cover or in an accessible valve box outside the sump. Reference: Section 712.2, IPC 2024.
4. Please identify the existing building drain receiving the ejector discharge, including pipe size and condition. Reference: Section 703.4, IPC 2024.
5. Please provide the total dynamic head for the sewage ejector pump and demonstrate that the existing building drain and building sewer are adequately sized to accommodate the design flow. Reference: Section 709.3 and 710, IPC 2024.
06/12/2026 PDSD Application Completeness Express REVIEW COMPLETED