Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0625-01177
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/11/2025 | Site Zoning Standard | APPROVED | |||
| 07/14/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/11/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Please amend plans to show how the accessibility elements have been upgraded. IEBC 305.7 requires that accessibility be provided to the altered spaces. Where the existing path of travel elements, which entails a primary entrance, a primary path of travel, sanitary facilities serving the area, a drinking fountain, and signs. If these items are not fully compliant, upgrades shall be required in accordance with IEBC.305.7. For example, the restrooms do not appear to be fully compliant with the 2009 ICC A117.1 604.3 clearances around the water closet and they do not appear to have grab bars 2009 ICC A117.1609. Adding grab bars could possibly meet the criteria described below. A. If the cost of providing or upgrading the items above to be accessible is disproportionate to the cost of construction (exceeds 20% of the cost of construction not including accessibility upgrades), please provide information to verify construction costs. If this exemption is taken, accessibility upgrades equaling 20% of the cost of the project shall be made. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 07/14/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 06/20/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |