Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: TC-COM-0625-01086
Parcel: 125100500

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - LIMITED v.2

Permit Number - TC-COM-0625-01086
Review Name: COMMERCIAL REVIEW - LIMITED v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/26/2025 Commercial Electrical APPROVED
07/10/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/10/2025 Commercial Mechanical REQUIRES RESUBMIT Supply air delivered to the restroom when the exhaust fan is turned off will result in 100% of the air being circulated to the building. Note g of Table 403.3.1.1 applies when the exhaust is passed through a heat recovery unit; those units have up to 10% leakage of the exhaust to the supply airstream. The exhaust fan should be operating continuously during the hours of operation. This is typically achieved using a time clock. [Initial comment: Provide information on the sequence of operation for the restroom exhaust fans to show that all the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2018.]
07/10/2025 Commercial Plumbing REQUIRES RESUBMIT The term “private” for plumbing fixtures applies to fixtures that are located in a residence or apartment, non-public toilet rooms in hotels or motels, and are intended for the use of a family or an individual. The new restroom is required to comply with the requirements of Section C404.5, IECC 2018. Reference: Section 202, IPC 2018. [Initial comment: Verify that the distance from the hot water source to the hot water termination for the public lavatory complies with the requirements of Section C404.5, IECC 2018 (e.g., 24” for a ½” supply).]
06/25/2025 PDSD Application Completeness Express REVIEW COMPLETED