Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Permit Number - TC-COM-0624-01172
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/12/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/11/2026 | Concrete Installation Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | The actual concrete Special Inspection field report will be required for this workflow to be completed. No such document was submitted. | ||
| 02/12/2026 | External Reviewers - Stantec Express | REQUIRES RESUBMIT | February 12, 2026 2nd Review Ankrom Moisan Architects Attn: Jason Jones 38 NW Davis Street Portland, Oregon 97209 Re: CAPSTONE SPEEDWAY STUDENT HOUSING SUPER, SHELL, CORE & FITOUT (DEFERRED SUBMITTALS) City of Tucson Permit Number: TC-COM-0624-01172 Stantec Project Number: 185215066 Stantec File Number: TUC-25-115 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms A-2 I-A 7,600 278 Yes Yes B 2,288 16 R-2 44,340 227 S-2 54,885 250 R-2 III-A 165,181 946 Separate Permits: Automatic fire sprinklers, fire alarm, smoke control, swimming pool, site utilities. Deferred Submittals: Pre-engineered wood trusses, exterior cladding and steel stud framing, steel stairs, glass guardrail, roof tie backs and anchorages, post-tension shop drawings, non-bearing interior stud partition walls, elevator shop drawings, storefront shop drawings. Special Inspections: Earthwork, concrete, caissons, post-tension, epoxy and expansion anchors, structural steel, high-strength bolts, field welding, masonry, wood construction, and outdoor lighting. ARCHITECTURAL COMMENTS General 1. Addressed. 2. Previous Comment: The floor truss and roof truss calculations indicate on the documents that they are not for construction. Please resubmit floor truss calculations that are final and for construction. Still Required: The roof truss calculations were not resubmitted for review. Please provide. 3. New Comment: The latest submittal is missing documents that were included in the first submittal. This submittal does not include the metal studs design, roof truss calculations, and stair 3 shop drawings. All documents must be resubmitted with each review cycle. STRUCTURAL COMMENTS General 1. Previous Comment: The roof trusses, floor trusses, level 1 post-tension slab, level 2 post-tension slab, and stair 2 shop drawings all include a review stamp from PK Associates but do not include a mark on the status of the review. Please revise and resubmit. Still Required: The stair 2 shop drawings, level 1 post-tension, and level 2 post-tension slab shop drawings still do not include a mark on the status of the review from PK Associates. Further, the roof trusses were not provided in the latest submittal to determine if this comment was addressed. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 02/11/2026 | Post-Tension Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Based on the inspections completed, this project is still in construction. Once such work is done, the actual Post Tension field Special Inspection report will be required to be submitted. | ||
| 02/11/2026 | Special Inspection Certificate Review (Deferred Submittal) Express | REQUIRES RESUBMIT | This current submitted version of the Special Inspection Certificate form with Parts A and B completed was already used to result the initial review of the certificate. Once the Special Inspections field reports are ready to be submitted, please complete Part C of the certificate form and submit the field reports. | ||
| 02/03/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |