Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0624-01069
Parcel: 127090180

Review Status: In Review

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0624-01069
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
N/A Bldg Permits - Post Review PENDING ASSIGNMENT
N/A Site Engineering PENDING ASSIGNMENT
N/A Site Zoning PENDING ASSIGNMENT
N/A Water - PDSD PENDING ASSIGNMENT
09/18/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 9/12/2024 1:57:30 PM



Building(B) Reviewer
Janet Matz
jmatz@safebuilt.com
Approved
Reason:
Date Completed : 9/18/2024 12:24:10 AM





Mechanical(M) Reviewer (from previous submittal TUC9565001.060524)
Jorge Valido
jvalido@safebuilt.com
Approved with Comments
Reason:
Date Completed : 6/18/2024 2:40:23 PM
1. Heat Load Calculations - July DESIGN COOLING DAY, 1500 - Pages 9 of 42, 23 of 42, 37 of 42 - These sheets state Heating BTUH Loads for Sensible BTUH and Latent BTUH for the Design Cooling Day loads- Should be Sensible Cooling BTUH and Latent Cooling BTUH - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads. - 2018 IBC – Section [A]107.2.1Information on construction documents





Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 8/29/2024 12:12:32 PM
1. On sheet E2.1 Could not locate Keyed Notes 5, 6, and 12. Addressed
2. On sheet E4.2 Need to show/provide overcurrent protection for the Main Service as per NEC 230.90. Current design only shows ‘Disconnect Switch’ but does not call out or show overcurrent protection for the MDP (Main Distribution Panel). Addressed






Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 9/8/2024 8:52:35 PM
Second Plumbing Review: Comments 3 & 4 still Remain
Resolved-1). Plan page A1.3:Small roof with scupper to main roof is missing a secondary thru wall scupper. Add a secondary scupper in accordance with -2018 IPC 1106.5 & section 1108

Resolved-2). Plan page P1.2: missing the storm piping GPM loads at each roof drain, and at points of interconnection, and at each bldg termination> Add all the GPM loads in accordance with -2018 IPC 1106.2

Un-resolved-3). Plan pages P1.3 & P2.1: Missing required Grease interceptor vent. Add required grease interceptor vent to the plan pages in accordance with 2018 IPC 1003.9 **Vent still not illustrated**

Un-resolved4). Plan page GA.1 : missing fixture spacing measurements. Add fixture spacing measurements to plumbing or architectural or plumbing pages in accordance with 2018 IPC 404.2, 405.3.1 **Fixture center to adjacent sidewall
measurements still not shown for lavs **

Resolved-5). Plan Page M1.4: Missing gas system legnth & sizing table used. Add the gas system sizing table & system legnth to plan page M1.4 in accordance with -2018 IFGC 402.3
08/28/2024 PDSD Application Completeness REVIEW COMPLETED