Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
6105 E BROADWAY BL
Apply Date:
06/03/2024
Applicant:
John Morgan
Description:
New McDonald's Building

Permit Reviews

Permit Number - TC-COM-0624-01069
Permit Status: Complete
Permit Description: New McDonald's Building
Start Date Submittal Complete Date Status  
12/03/2024 COMMERCIAL REVIEW - FULL v.5 12/04/2024 APPROVED Review Details
12/05/2024 RESTAMP - COMMERCIAL v.1 12/10/2024 APPROVED Review Details
10/18/2024 COMMERCIAL REVIEW - FULL v.4 11/15/2024 REQUIRES RESUBMIT Review Details
01/10/2025 COMMERCIAL REVIEW - FULL v.1 02/03/2025 REQUIRES RESUBMIT Review Details
06/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/20/2025 APPROVED Review Details
10/18/2024 COMMERCIAL REVIEW - FULL v.3 10/18/2024 REQUIRES RESUBMIT Review Details
02/11/2025 COMMERCIAL REVIEW - FULL v.2 02/25/2025 APPROVED Review Details
06/05/2024 COMMERCIAL REVIEW - FULL v.1 07/10/2024 REQUIRES RESUBMIT Review Details
08/28/2024 COMMERCIAL REVIEW - FULL v.2 09/30/2024 REQUIRES RESUBMIT Review Details
09/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/17/2025 APPROVED Review Details
12/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/30/2024 APPROVED Review Details
07/10/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/14/2025 APPROVED Review Details
07/07/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/09/2025 REQUIRES RESUBMIT Review Details
08/04/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/05/2025 APPROVED Review Details
08/04/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/04/2025 REQUIRES RESUBMIT Review Details
07/01/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/02/2025 APPROVED Review Details
02/25/2025 RESTAMP - COMMERCIAL v.1 03/03/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0624-01069
Permit Status: Complete
Permit Description: New McDonald's Building
Date Description Comments
10/21/2024 AIR BALANCING REPORT IS REQUIRED.
10/21/2024 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
10/21/2024 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
10/21/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/05/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/21/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
10/21/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
10/21/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
10/21/2024 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
01/30/2025 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor.
10/21/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
06/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/21/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/21/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
10/21/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
10/21/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0624-01069
Permite Description: New McDonald's Building
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
04/28/2025 COT - HCPL - Plumbing Intermediate N/A Canceled
04/28/2025 COT - HCME - Mechanical Above Ceiling N/A Canceled
04/28/2025 COT - HCPL - Plumbing Above Ceiling N/A Canceled
06/04/2025 COT - HCPL - Backwater Valve N/A Not Applicable
06/04/2025 COT - HCEL - Outdoor Lighting N/A Partial Pass Rough in.
06/04/2025 COT - HCPL - Yard Water Line N/A Canceled
06/20/2025 COT - HCBU - TCO N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0624-01069
Permit Description: New McDonald's Building
Total Completed Inspections - 42
Date Description Inspector Results Comments
02/27/2025 COT - HCEL - Grounding/Bonding Passed
03/18/2025 COT - HCBU - Preslab Passed
04/01/2025 HCBU - Preslab and Floodplain Inspection Passed
04/01/2025 COT - HCME - Venting Passed
04/16/2025 COT - HCBU - Exterior Clips/Sheathing Passed
04/16/2025 COT - HCBU - Roof Nailing Passed
04/22/2025 COT - HCBU - Interior Shear Bracing Passed
04/22/2025 COT - HCME - Mechanical Intermediate Passed
04/30/2025 COT - HCEL - Electrical Intermediate Passed
04/30/2025 COT - HCPL - Plumbing Roof Drains Passed
04/30/2025 COT - HCPL - Plumbing Intermediate Passed
04/30/2025 COT - HCME - Mechanical Above Ceiling Passed
04/30/2025 COT - HCPL - Plumbing Above Ceiling Passed
05/07/2025 BULD - Electrical Clearance Passed ECO
05/07/2025 COT - HCBU - Building Progress Passed lath
05/07/2025 COT - HCPL - Sewer Passed
05/20/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
05/22/2025 COT - HCBU - Firewall/Fire Barrier/Firestop Passed Hood System wrap
05/30/2025 COT - HCBU - Building Above Ceiling Passed
06/03/2025 COT - HCBU - Stem Wall/Retaining Wall Passed
06/03/2025 COT - HCBU - Masonry Pregrout Passed
06/04/2025 COT - HCBU - Framing Passed
06/04/2025 COT - HCEL - Electrical Above Ceiling Passed
06/04/2025 COT - HCEL - Electrical Underground Passed
06/04/2025 COT - HCPL - Gas Pressure Test Passed
06/04/2025 COT - HCPL - Rough Soil Passed
06/05/2025 COT - HCEL - Outdoor Lighting Passed
06/10/2025 COT - BULD - SWG Clearance Passed SWG
06/16/2025 COT - HCPL - Yard Water Line Passed
06/16/2025 COT - HCEL - Electrical Final Passed
06/16/2025 COT - HCME - Mechanical Final Passed
06/16/2025 COT - HCPL - Gas Final Passed
06/16/2025 COT - HCPL - Plumbing Final Passed
06/17/2025 COT - FCON - Hood System - Final Passed
06/17/2025 COT - FCON - Sprinkler - Final Passed
06/20/2025 COT - HCBU - Building Final Passed
06/27/2025 COT - FCON - Alarm - Final Passed
06/27/2025 TRSP - ROW - Final/Close-Out Passed
06/27/2025 COT - HCBU - CofO Passed Pending Engineering final.
07/01/2025 COT - FCON - Fire - Final Passed
07/08/2025 ENGR Engineering Final Passed
08/01/2025 COT - HCBU - TCO Passed Level 4

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE_ODL_MONRAD BROADWAY MCDONALDS 16 SEPT 2025-2025-09-16_V1.PDF DOCUMENTS VIEW
MCDONALDS SITE 20062 FINAL-2025-08-04_V2.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
25G0117_1 TURNERRES 07 03 2025 0826-2025-07-03_V1-2025-07-09_V2.PDF DOCUMENTS VIEW
MCDONALDS SITE 20062 FINAL-2025-06-19_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MCDONALD'S 6105 E. BROADWAY AIR BALANCE REPORT_V1.PDF DOCUMENTS VIEW
CONS-REV 1_2ND_TC-COM-0624-01069 BUILDING PLANS_V2.PDF DOCUMENTS VIEW
CONS-4_TC-COM-0624-01069_BUILDING PLANS_V4.PDF DOCUMENTS VIEW
1_DEFERRED SUBMITTAL_TRUSS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1.1_STRUCTURAL CALCS_V1.PDF DOCUMENTS VIEW
1_COMCHECK-WEB_COMPLIANCE_REPORT_V1.PDF DOCUMENTS VIEW
1_HEAT LOAD CALCULATIONS_V1.PDF DOCUMENTS VIEW
1_LIGHTING ENERGY CALCS_V1.PDF DOCUMENTS VIEW
1_MECHANICAL COMPLIANCE_V1.PDF DOCUMENTS VIEW
1_REDUCED PRESSURE BACKFLOW PREVENTER_V1.PDF DOCUMENTS VIEW
2.1_TC-COM-0624-01069_SOILS REPORT_V1.PDF DOCUMENTS VIEW
2_TC-COM-0624-01069_SPECIAL INSPECTIONS CERT-2024-08-27_V1.PDF DOCUMENTS VIEW
2_TC-COM-0624-01069_STRUCUTRAL REPORT_V1.PDF DOCUMENTS VIEW
CONS-4_TC-COM-0624-01069_BUILDING PLANS_V4.PDF DOCUMENTS VIEW