Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0525-01005
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/02/2025 | Commercial Building Standard | APPROVED | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 5/30/2025 8:50:28 PM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/21/2025 12:59:39 PM |
||
| 06/02/2025 | Commercial Mechanical Standard | APPROVED | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 5/28/2025 7:34:27 PM |
||
| 06/20/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/02/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 5/26/2025 3:16:37 PM 1. E4.3: Single Line Riser Diagram needs to provide Overcurrent protection for MDP Panel per NEC 240.4. This can be through the Disconnect switch (enclosed CB or Fused Disc.) or a Main Circuit breaker in the MDP panel. Current design has no overcurrent protection shown. 2. E4.3: Need to provide conductor and grnd wire size for Computer panel on Single Line Riser Diagram. 3. E4.3: PV system needs to be called out as a future permit submittal or provide raceway/feeder information and equipment values if it is to be permitted with this application. 4. ES1.2: Need to perform a Tucson City Lumens per acre calculation as per local electrical code requirement and show compliance. |
||
| 06/02/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 5/31/2025 12:41:54 PM FIRST PLUMBING REVIEW: 1). PLAN PAGE P1.3: Missing sanitary vent for back to back toilets & Lavs. Add sanitary vent for back to back toilets & Lavs. -2018 IPC 901.2.1 2). Plan pages P1.3 & P2.1: The sanitary/vent piping configurations so for all 3 toilets don't correlate on these plan pages. Update plan pages to correlate with each other. -2018 IPC 106.3.1, 901.2.1 3). Plan page M1.4: Missing Gas system legnth & gas sizing table used. Add Gas system legnth & gas sizing table used. - 2018 IFGC 402.3 |
||
| 05/29/2025 | Outdoor Lighting Standard | REQUIRES RESUBMIT | Outdoor Lighting Review TC-COM-0525-01005 Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). Outdoor Lighting Review: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf 1. Provide an outdoor lighting plan that meets the requirements of OLC 104.2. Show/locate the different light sources on your site plan. Number the light fixtures on your lighting fixture table and use the same number on your site plan. 2. List the Lighting Area per OLC chapter 3 and used in Table 401.1. Specify the compliance option from Table 401.1 that is being used. Total outdoor light output shall not exceed the lumen limits listed in Table 401.1. 3. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 104.2.1, 401.2. Include all exterior fixtures on the property in the calculations. List shielded and unshielded lights in the calculation. Show unshielded fixtures with a maximum of 3,000 lumens, OLC 401.4. Show lamps with a maximum of 3500K color temperature, OLC 402.1. 4. Fixtures installed under canopies and overhangs. Outdoor lighting fixtures shall not be counted in determining the total light output when they are full cutoff light fixtures installed under canopies, building overhangs, or roof eaves, OLC 401.2.1(3). 5. Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf 6. Specify any exceptions used. 7. Provide Curfew lighting controls If applicable Per section 403 and Table 601.3. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 06/20/2025 | Site Engineering Standard | REQUIRES RESUBMIT | TC-COM-0525-01005 141019160 Site Engineering Comments: - Final Site Engineering approval of this plan cannot occur until the development package (DP), TD-DEV-0525-00132, is approved marco.contreras@tucsonaz.gov |
||
| 06/10/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Ramiro Olivarez Zoning Review Section PROJECT: TC-COM-0525-01005 141019160 – PAD-12 Zoning (1st Review) TRANSMITTAL DATE: June 10, 2025 This site is located in the PAD-12 COMMENTS: Please resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. Comment: Final Site Zoning approval of this plan cannot occur until the development package (DP), TD-DEV-0525-00132, is approved. Once approved, please resubmit the building permit. Ensure the building permit documents match the approved development package (for example, inclusion, of new shade structures). 2. Comment: The gross building area and building height do not match what is indicated in DP TD-DEV-0525-00132. Ensure all building data matches what is indicated in the DP. 3. Comment: Additional comments may be forthcoming on the next review based on the proposed use and applicable use specific standards. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: As noted above. If you have any questions about this transmittal, please contact Ramiro Olivarez Ramiro.Olivarez@tucsonaz.gov |
||
| 06/09/2025 | Water - PDSD Standard | REQUIRES RESUBMIT | Show the location and size of the proposed water meter, backflow preventer, the water service pipe, and other yard water piping on a site plan (i.e. not on a “reference only” drawing) as stated in keynote 1, P1.0. The development package is not a substitute for a complete site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018. | ||
| 05/28/2025 | Fire New Construction Standard | REVIEW COMPLETED | Fire extinguishers shall comply with section 906 of the 2024 IFC. | ||
| 05/16/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |