| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/30/2025 | Commercial Electrical Standard | APPROVED | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 5/21/2025 5:15:27 PM |
||
| 05/30/2025 | Commercial Mechanical Standard | APPROVED | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 5/28/2025 3:21:06 PM |
||
| 06/05/2025 | Water - PDSD Standard | APPROVED | |||
| 05/23/2025 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting | ||
| 06/10/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 06/10/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/30/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 5/26/2025 5:24:29 PM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 5/19/2025 3:03:04 PM 1. General/Manufacturing Process: Please provide a detailed description of the manufacturing process. Provide clarification on what is being manufactured and an overview of the process. 2. General/Storage Areas: It is unclear how the incoming goods area will be used. Please provide clarification on the incoming goods area. What is being stored? Height of storage? 3. General/Locker Rooms: Enlarged locker room plans have not been provided. Provide enlarged views of the locker rooms. Also, a provide a locker detail. |
||
| 05/30/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 5/30/2025 10:15:41 AM FIRST PLUMBING REVIEW: 1). Plan pages P1.2WH & P4.0WH: what will be drained into laboratory sink? Any harmful discharge will need to comply with -2018 IPC 302 & 803 2). Plan Page P1.2WH: Missing shut off valve at lift pump. Add shut off valve at lift pump. -2018 IPC 712.2 |
||
| 06/05/2025 | Site Zoning Standard | REQUIRES RESUBMIT | FROM: Olga Salazar PDSD Zoning Review Section PROJECT: TC-COM-0525-00955– Manufacturing Tenant Improvement (1st Review) 6950 S COUNTRY CLUB RD – I-1 Zoning TRANSMITTAL DATE: June 5th, 2025 DUE DATE: June 5th, 2025 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the I-1 zone. The type of manufacturing was not specified. Add a note to the scope of work specifying the type of manufacturing that will occur on site in order to verify whether or not the proposed use will be in compliance with the use specific standards for the zone and use. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the proposed manufacturing use and compliance with the use specific standards. 3. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified compliance with the use specific standards, the building plans can be approved by zoning. If you have any questions about this transmittal, please contact zone1.desk@tucsonaz.gov. |
||
| 05/21/2025 | Fire New Construction Standard | REVIEW COMPLETED | Fire alarm and fire sprinkler upgrades requires a separate submittal and permit, fire extinguishers shall comply with Section 906 of the 2018IFC. | ||
| 05/14/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |