Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0525-00929
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/03/2025 | Commercial Mechanical Standard | APPROVED | |||
| 06/04/2025 | Site Zoning Standard | APPROVED | |||
| 06/04/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/02/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Please indicate if special inspection are required for this project and list on the construction drawings. IBC 107.2. 2. If Special inspections are required; Please amend the plans to provide the statement of special inspections and print the complete statement on the construction documents. IBC 1704.1 3. If Special inspections are required; Please provide the special inspection certificate with Part A, and Part B, completed with next submittal. IBC 107.2.1 https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate.pdf Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 |
||
| 05/21/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0525-00929 (7000 S ALVERNON WY TUCSON, AZ 85756) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC), 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Provide an updated EOR seal with an updated date signed. The date signed is prior to the new scope of work. 2. Show that the ‘Integral Power Maintenance Receptacles’ are not connected to the load side of the equipment disconnecting means, NEC 210.63. 3. Provide electrical load calculations, for the Main Service Panel, Per NEC 220.40. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 05/15/2025 | Fire New Construction Standard | REVIEW COMPLETED | Duct smoke detectors shall be monitored by the local fire alarm per the 2024 IFC and NFPA72 2022 Edition. | ||
| 05/12/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |