| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/20/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/10/2025 | Commercial Building | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0525-00891 ADDRESS/PARCEL: (450 S TOOLE AV TUCSON, AZ 85701) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. COMMENTS: 1. Please provide a special inspection certificate with Part A, and Part B completed with next submittal. This form is available in https://www.tucsonaz.gov/files/sharedassets/public/city-services/planning-development-services/documents/special_inspection_certificate.pdf Ensure that Part B is sealed/signed/dated by the special inspector in charge. Ensure to use Special Inspectors who are active in the approved list of special inspectors. They are available in the following links: special-inspectors-by-name.pdf (orovalleyaz.gov) https://content.civicplus.com/api/assets/e426f390-7bd6-4c47-9bc1-357282083afd https://www.phoenix.gov/pddsite/Documents/TRT/dsd_trt_pdf_00870.pdf a. Your drawings indicated the following special inspections. Please do make sure to enumerate them within the special inspection certificate form; i. Bolts Installed in Concrete ii. Concrete Installation iii. Structural Steel (Special Moment Resisting Steel Frames) iv. Welding 2. Thermo Bond Building Modular Double Wide (DW) a. Tom Williams, Per our phone conversation on Tuesday 6/10/25 this is a Factory Built Building. i. You also mentioned that a submission was already made with the State of Arizona. 1. Please do make sure that you submitted everything to them to include. a. Mechanical b. Electrical c. Plumbing d. Structural Calculations and Drawings 2. Please submit a copy of the construction drawing approval from the state that includes all of the above. 3. Submit a copy of the installation approval. 3. Sheet T1.0 Code Analysis a. Please complete your Code Analysis to include the Proposed Use, Occupancy Classification, Construction Type, Occupant Load, etc. b. We will issue a Certificate of Occupancy for this building. The information above will be required to fill it in. 4. Sheet A2.1 a. Please add all the utilities route on this sheet. Label them, for example “electrical source at a pole with transformer”, “overhead line and required clearance over roof”, etc. 5. Please resubmit. If you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976 |
||
| 06/03/2025 | Commercial Electrical | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0525-00891 (450 S TOOLE AV TUCSON, AZ 85701) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Provide electrical sheets as shown in the Sheet Index, specifically Sheets E1.0, and E4.0 for site electrical and grounding details. . All Electrical sheets are missing. 2. Note and show compliance with outdoor lighting if any new exterior lights are being added. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 06/20/2025 | Site Engineering | REQUIRES RESUBMIT | TC-COM-0525-00891 450 S TOOLE AV Comments: - This falls under Unified Development Code.3.3.G.2.A.b with the reconfiguration of an area outside a building and therefore will require for a Development Package to be submitted for the entire site in accordance with 2-06.0 of the Administrative Manual. The associated commercial building permit TC-COM-0525-00891 will not be able to proceed forward to approval until a development package is submitted and approved for the site. Marco.contreras@tucsonaz.gov |
||
| 06/19/2025 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-COM-0525-00891 450 S TOOLE AV. - I-1 Communications - Install (1) new equipment shelter, (1) new concrete pad. Install (1) new concrete side walk and concrete entry pad (1st Review) TRANSMITTAL DATE: February 24, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the I-1 zone (UDC 4.7.29). 1. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A Development Package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to approval of this building plan. The Administrative Manual can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes-and-Plans/Zoning-Code#section-1. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 06/04/2025 | Fire New Construction | REVIEW COMPLETED | Per the 2024 IFC section 506: a Knox type lock is required at the fence gates. | ||
| 06/02/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |