Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.2
Permit Number - TC-COM-0524-00986
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/05/2024 | Site Engineering | NOT REQUIRED | |||
06/04/2024 | Site Zoning | NOT REQUIRED | |||
06/10/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
06/10/2024 | Commercial Mechanical | REQUIRES RESUBMIT | Replacement of commercial AC units constitutes new work so the submittal will require a heating/cooling load calculation to justify the capacities of the units being installed (Sections C403.3.1 and C403.2.2, IECC 2018). While ventilation calculations are not required, a test and balance report is required to verify that the total supply airflow and the outside airflow are at least equal to that which the previous AC unit provided. Reference: Section C503.4, IECC 2018. | ||
05/23/2024 | PDSD Application Completeness | REVIEW COMPLETED |