Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0524-00917
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/07/2024 | Site Zoning | APPROVED | |||
06/11/2024 | Water - PDSD | APPROVED | |||
06/10/2024 | Site Engineering | NOT REQUIRED | |||
06/18/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
06/18/2024 | External Reviewers - Stantec | REQUIRES RESUBMIT | May 31, 2024 1st Review CMA, LLC Attn: Chuck Meyer 11598 W. Rock Village St. Marana, Arizona 85658 Re: NEFAB MEN’S TOILET ROOM TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0524-00917 Stantec Project Number: 185215066 Stantec File Number: TUC-24-046 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms S-1 II-B N/A N/A Yes Yes Separate Permits: None. Deferred Submittals: None. Special Inspections: None. ARCHITECTURAL COMMENTS General 1. Please provide the square footage for the scope of work proposed with this tenant improvement. [Ref. IBC 2018 Sec. 107.1] STRUCTURAL COMMENTS There are no comments. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS Sheet P1 1. Please provide updated water pressure calculations. [Ref. IPC 2018 Sec. 604] ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
05/26/2024 | Fire New Construction | REVIEW COMPLETED | |||
05/16/2024 | PDSD Application Completeness | REVIEW COMPLETED |