Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Apply Date:
05/13/2024
Applicant:
Billy Meyer
Description:
CONVERT EXISTING BREAK ROOM INTO AN ADDITIONAL MENS TOILET ROOM, AND MOVE BREAK ROOM INTO ADJACENT EXISTING OFFICE

Permit Reviews

Permit Number - TC-COM-0524-00917
Permit Status: Inspections complete
Permit Description: CONVERT EXISTING BREAK ROOM INTO AN ADDITIONAL MENS TOILET ROOM, AND MOVE BREAK ROOM INTO ADJACENT EXISTING OFFICE
Start Date Submittal Complete Date Status  
06/26/2024 RESTAMP - COMMERCIAL v.1 06/27/2024 APPROVED Review Details
12/31/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/02/2025 APPROVED Review Details
05/16/2024 COMMERCIAL REVIEW - FULL v.1 06/18/2024 REQUIRES RESUBMIT Review Details
06/20/2024 COMMERCIAL REVIEW - FULL v.2 06/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0524-00917
Permit Status: Inspections complete
Permit Description: CONVERT EXISTING BREAK ROOM INTO AN ADDITIONAL MENS TOILET ROOM, AND MOVE BREAK ROOM INTO ADJACENT EXISTING OFFICE
Date Description Comments
06/26/2024 AIR BALANCING REPORT IS REQUIRED.
06/26/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0524-00917
Permite Description: CONVERT EXISTING BREAK ROOM INTO AN ADDITIONAL MENS TOILET ROOM, AND MOVE BREAK ROOM INTO ADJACENT EXISTING OFFICE
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/30/2024 COT - FCON - Alarm - Final N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0524-00917
Permit Description: CONVERT EXISTING BREAK ROOM INTO AN ADDITIONAL MENS TOILET ROOM, AND MOVE BREAK ROOM INTO ADJACENT EXISTING OFFICE
Total Completed Inspections - 15
Date Description Inspector Results Comments
07/02/2024 COT - HCPL - Rough Soil Passed
12/30/2024 COT - FCON - Fire - Final Passed
12/30/2024 COT - HCBU - Building Final Passed
12/30/2024 ENGR Engineering Final Passed
12/30/2024 TRSP - ROW - Final/Close-Out Passed
12/30/2024 COT - HCBU - Framing Passed
12/30/2024 COT - HCEL - Electrical Above Ceiling Passed
12/30/2024 COT - HCEL - Electrical Final Passed
12/30/2024 COT - HCEL - Electrical Intermediate Passed
12/30/2024 COT - HCME - Mechanical Above Ceiling Passed
12/30/2024 COT - HCME - Mechanical Final Passed
12/30/2024 COT - HCPL - Plumbing Above Ceiling Passed
12/30/2024 COT - HCPL - Plumbing Final Passed
12/30/2024 COT - HCME - Mechanical Intermediate Passed
12/30/2024 COT - HCPL - Plumbing Intermediate Passed