Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0524-00913
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/02/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
07/15/2024 | External Reviewers - Stantec | REQUIRES RESUBMIT | July 15, 2024 2nd Review Robert Caylor Construction Attn: Robert Caylor 2 E. Congress, Suite 900 Tucson, Arizona 85701 Re: THE TREASURY TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0524-00913 Stantec Project Number: 185215066 Stantec File Number: TUC-24-045 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms A-2 I-B N/A 499 Yes Yes Separate Permits: Automatic fire sprinklers, fire alarm, and kitchen hood suppression system. Deferred Submittals: None. Special Inspections: Epoxy and expansion anchors, structural steel, high-strength bolts, field welding. ARCHITECTURAL COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. 4. Note on the cover of the drawings that special inspection is required for epoxy and expansion anchors, structural steel, field welding. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. Still Required: The special inspection certificate provided indicates Ron Schneider P.E. for the special inspection of field welding. The special inspector list does not include field welding as an approved special inspection discipline for Ron. Please provide Ron’s welders card, AWS certification, or ICC welding certification to determine qualification. 5. Please submit an appeal to the building official for the proposed reduced occupant load provided. The occupant load provided is calculated based on the number of seats in the assembly areas instead of the square footage factor of 7 net in accordance with Table 1004.5. After review of the tenant space exit capacity is still sufficient based off the factor of 7 net but would require additional plumbing facilities to comply with Section 2902.1. To use the reduced occupant load provided for plumbing facilities an appeal must be approved by the building official. Still Required: Please provide a copy of the approved appeal referenced in the response letter. Sheet A1 1. Addressed. Sheet A6 1. Addressed. STRUCTURAL COMMENTS There are no comments. MECHANICAL COMMENTS Sheet M4 1. Addressed.] Sheet M9 1. Addressed. PLUMBING COMMENTS Sheet P2 1. Addressed. Sheet P10 1. Addressed. 2. Addressed. ELECTRICAL COMMENTS Sheet E14 1. Addressed. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
08/02/2024 | Fire New Construction | REVIEW COMPLETED | |||
07/08/2024 | PDSD Application Completeness | REVIEW COMPLETED |