Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 11712087B
Parcel Search
Parcel Attributes
Parcel | 11712087B |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | OCR-2 |
Tucson Ward | Ward 6 |
Tucson Downtown Incentive Zone | Downtown Core, Downtown Infill Incentive District |
Rio Nuevo Downtown | Rio Nuevo - Downtown |
Rio Nuevo Multipurpose Facilities District | Yes |
Tucson Registered Neighborhood | Downtown |
Major Streets & Routes | Gateway Route |
Redevelopment | Downtown Redevelopment District |
Structure on National Register of Historic Places | Individually Listed |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Address |
Annexations & Original City Zoning (OCZ)
Date - 11/15/2024 3:50 a.m.
Total Number Of OZC Plans - (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
Original Town Of Tucson | ORIGINAL | 08/07/1877 | None |
Special Development Requests & Requirements
Date - 11/15/2024 3:50 a.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
T18SA00090 | Complete | N/A |
Permits
Parcel Number - 11712087B
Date - 11/15/2024 3:50 a.m.
Total Number Of Permits - (32)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-UTL-0224-00226 | Complete | 02/02/2024 | 06/04/2024 | Right-of-Way (ROW) - Utility | PRJ264317-1 **TCP ONLY** COX TO SPLICE FOR SYSTEM TIE IN. (Work Zone along eastside of Southbound Stone Ave, South of Congress St) | |
TC-COM-0524-00913 | Inspections | 05/13/2024 | 05/05/2025 | Commercial Building | Interior remodel | |
T22CM04970 | Issued | 07/01/2022 | 03/22/2024 | Commercial Building | Automatic Transfer Switch (ATS) Replacement at the Chase Building. | |
DP17-0168 | Complete | 07/11/2017 | 11/02/2021 | Development Package | SITE | |
TF-FCP-0924-00786 | Issued | 09/13/2024 | 03/30/2025 | Fire Construction Permit | Expansion of the existing Fire Alarm System. | |
TS-PRM-1024-00482 | In review | 10/31/2024 | 04/29/2025 | BLDG 0 UNIT 100 | Sign - Permanent | (1) New illuminated wall sign, (2) new non-illuminated wall signs |
T12EX00590 | Closed | 11/01/2012 | 12/31/2012 | EXCAV | EXCA:3'X4' HAND HOLE OVER EXISTING 4"CONDUIT IN SIDEWALK | |
T13BU00816 | Final | 07/03/2013 | 02/12/2014 | 07 | SPKLR | RELOCATE 19 SPRINKLERS |
T13CM04118 | C of o | 07/08/2013 | 02/18/2014 | 07 | COMBO | TI: OFFICE |
T14CM06541 | Final | 10/02/2014 | 07/12/2015 | COMBO | REPLACE CHILLER | |
T15BU01347 | Final | 11/18/2015 | 09/20/2016 | 01 | SPKLR | FIRE SPRKL |
T15CM01486 | Withdrwn | 03/04/2015 | N/A | 06 | COMBO | INTERIOR REMODEL |
T16BU00673 | Closed | 04/29/2016 | 04/10/2023 | 06 | SPKLR | FIRE SPRKL |
T16CM02627 | L of c | 04/11/2016 | 11/23/2016 | 06 | COMBO | TI; COMMERCIAL |
T17BU00078 | Expired | 02/23/2017 | 08/22/2017 | DEMO | INTERIOR DEMO ON FLOORS 3,4,5 | |
T17CM01473 | C of o | 02/23/2017 | 04/03/2018 | 03 | COMBO | APARTMENTS 3RD FLOOR |
T17CM01474 | C of o | 02/23/2017 | 04/03/2018 | 04 | COMBO | APARTMENTS 4TH FLOOR |
T17CM01475 | C of o | 02/23/2017 | 04/03/2018 | 05 | COMBO | APARTMENTS 5TH FLOOR |
T17CM04515 | L of c | 06/09/2017 | 06/06/2018 | COMBO | STAIR MODIFICATION | |
T17FC00269 | Final | 04/05/2017 | 02/18/2018 | 05 | FIRECONS | RELOCATE/REPLACE 66 SPRINKLERS; ADD 7 NEW SPRINKLERS |
T17FC00280 | Final | 04/10/2017 | 04/03/2018 | FIRECONS | INSTALL FIRE ALARM AND DETECTION DEVICES IN THE RENOVATED FLOORS - CONNECT TO THE EXISTING (ADDRESSABLE) FIRE PANEL | |
T17FC00309 | Final | 04/19/2017 | 02/18/2018 | 04 | FIRECONS | Relocate/Replace 62 sprinklers Add 8 new |
T17FC00345 | Final | 04/28/2017 | 04/03/2018 | FIRECONS | RELOCATE 43 PENDENT SPRINKLERS, ADD 299 SPRINKLERS (3RD FLOOR) | |
T17RW01093 | Final | 03/09/2017 | 07/08/2017 | ROW | PLACE ROLLOFF IN LOADING ZONE #22 | |
T17RW02563 | Final | 06/13/2017 | 07/25/2017 | ROW | TEP NEEDS TRAFFIC CONTROL TO PERFORM MAINTENANCE ON AN EXISTING UG VAULT | |
T17RW02635 | Expired | 06/16/2017 | 06/23/2017 | ROW | PREVENTIVE MAINTENANCE OF PUBLIC SEWER LINES ADDRESSES ON APPLICATION- 2-50 E CONGRESS & 400-1000 E UNIVERSITY BL | |
T17RW03904 | Void | 08/31/2017 | N/A | ROW | 08/25/17 WORKING WITHOUT A ROW PERMIT FOR A SIDEWALK SCUPPER INSTALLATION ON STONE AVE. 08/31/17 NOV WAS SENT CERTIFIED MAIL. 09/29/2017 SECOND NOV WAS SENT CERTIFIED MAIL | |
T18RW01932 | Expired | 04/30/2018 | 07/25/2018 | ROW | N.348825 - Job will fiber splice in MH 1635, MH 1463, MH 1275 and MH 1416 | |
T19RW06822 | Final | 11/06/2019 | 11/28/2019 | ROW | Sample a groundwater monitoring well (1 hour). (MW-PD-21) ADDRESS CHNAGED FROM "000 BLOCK, S STONE AVE" TO "2 E CONGRESS ST" NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. YOU WILL HAVE TO NOTIFY PARK TUCSON 24 HOURS BEFORE WORK, PLEASE READ BELOW FOR CONTACT INFO HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020. | |
T20CM01166 | Final | 02/20/2020 | 09/05/2020 | COMBO | W - INSTALLING NEW ACCESSIBLE TELLER STATION | |
T20RW02120 | Final | 04/14/2020 | 05/17/2020 | ROW | (2) 5X5 BELLHOLES IN CONCRETE- TO REPAIR/REPLACE GAS LINE. MOBILITY CONTROL PLAN SAME AS T20RW01550. FULL CLOSURE OF STONE AVE FROM 9:00 PM - 6:00 AM STARTING 4/20/20, MESSAGE BOARDS SET-UP 48-HRS IN ADVANCE TO STARTING WORK. OPEN TRENCHES SHALL BE PLATED TO ALLOW TRAFFIC CAPACITY. PLATES SHALL BE RECESSED/TO GRADE WHEN NOT ON SITE WORKING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. NOTIFY IN WRITING AT LEAST 5 WORKING DAYS BEFORE WORK BEGINS, ANY BUSINESSES, ESIDENCES AND PUBLIC TRANSIT ROUTES AFFECTED BY YOUR TEMPORARY TRAFFIC CONTROL. NOTIFY SUN LINK (520) 792-9222 PRIOR TO WORK. | |
T21RW04495 | Final | 09/30/2021 | 11/24/2021 | ROW | SIDEWALK CLOSURE ALONG STONE AV AS CREW WILL BE REPLACING THE CHASE SIGN ON THE CHASE BANK BUILDING LOCATED AT 2 E CONGRESS. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. MAINTAIN PEDESTRIAN ACCESS. 4. SUN LINK STOP IN AREA, CONTACT SUN LINK. 520-792-9222 5. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 |
Code Enforcement
Parcel Number - 11712087B
Date - 11/15/2024 3:50 a.m.
Total Number Of Code Cases - 1
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T20DV06872 | Complian | 10/16/2020 | N/A | DNR_VIOL | FLOODING ON 9TH FLOOR DUE TO CONSTRUCTION WORK/ ELEVATOR AFFECTED, POSSIBLY 21 UNITS |
Plans
Parcel Number - 11712087B
Date - 11/15/2024 3:50 a.m.
Total Number Of Plans - 1
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-BCA-0524-00027 | Complete | 05/31/2024 | N/A | Appeal - Building Official | Interior remodel |