Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-0524-00810
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/13/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/13/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | EXTERIOR INSULATION FINISH SYSTEM (EIFS) A special inspection of the EIFS system was placed on the plans by the Architect of record with the second submittal and noted on the cover sheet with all the other required special inspections. The final submittal did not have the special inspections listed; however the plans were not changed. Please have AOR provide the reason the EIFS special inspection was not required by way of a sealed letter. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 05/13/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 05/13/2025 | Masonry Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 05/12/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 05/13/2025 | Post-Installed Anchor Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 05/13/2025 | Site Prep Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 05/13/2025 | Welding Inspection (Deferred Submittal) Express | REVIEW COMPLETED |