Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
2886 N 1ST AV
Address NEW:
2886 N 1ST AV
Apply Date:
05/06/2024
Applicant:
Lisa Bowers
Description:
New Commercial Shell Bldg (demo permitted separately)

Permit Reviews

Permit Number - TC-COM-0524-00810
Permit Status: Complete
Permit Description: New Commercial Shell Bldg (demo permitted separately)
Start Date Submittal Complete Date Status  
05/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 05/20/2025 APPROVED Review Details
05/12/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/13/2025 REQUIRES RESUBMIT Review Details
10/09/2024 COMMERCIAL REVIEW - FULL v.4 10/18/2024 APPROVED Review Details
10/18/2024 RESTAMP - COMMERCIAL v.1 10/22/2024 APPROVED Review Details
06/26/2024 COMMERCIAL REVIEW - FULL v.2 08/01/2024 REQUIRES RESUBMIT Review Details
05/09/2024 COMMERCIAL REVIEW - FULL v.1 06/12/2024 REQUIRES RESUBMIT Review Details
06/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/17/2025 APPROVED Review Details
05/27/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/27/2025 REQUIRES RESUBMIT Review Details
08/28/2024 COMMERCIAL REVIEW - FULL v.3 09/27/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0524-00810
Permit Status: Complete
Permit Description: New Commercial Shell Bldg (demo permitted separately)
Date Description Comments
05/09/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
07/29/2024 SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED.
05/09/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/29/2024 SPECIAL INSPECTION FOR EXTERIOR INSULATION FINISH SYSTEM E.I.F.S. IS REQUIRED-SHEET A501
10/18/2024 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
07/29/2024 SPECIAL INSPECTION FOR POST INSTALLED ANCHORS-EPOXY SET, EXPANSION, & MECHANICAL IS REQUIRED.
05/09/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/29/2024 SPECIAL INSPECTION FOR EARTHWORK-EXCAVATION,COMPACTION AND FILLING IS REQUIRED.
10/18/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
07/29/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
07/29/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING/STEEL CONSTRUCTION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0524-00810
Permite Description: New Commercial Shell Bldg (demo permitted separately)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/29/2025 COT - LCBU - Stem Wall/Retaining Wall N/A Not Applicable
05/02/2025 COT - BULD - SWG Clearance N/A Not Applicable
04/29/2025 ENGR Engineering Final N/A Partial Pass The address address is not on the building yet the landscaping is not completed yet

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0524-00810
Permit Description: New Commercial Shell Bldg (demo permitted separately)
Total Completed Inspections - 23
Date Description Inspector Results Comments
01/08/2025 COT - HCPL - Rough Soil Passed
01/08/2025 COT - HCPL - Sewer Passed
01/08/2025 COT - HCPL - Yard Water Line Passed
01/08/2025 COT - LCBU - Excavation/Rebar/Zoning Passed
02/07/2025 COT - HCBU - Exterior Clips/Sheathing Passed
02/07/2025 COT - LCBU - Roof Nailing Passed
03/14/2025 COT - LCEL - Electrical Underground Passed
03/14/2025 COT - LCEL - Electrical Progress Passed
03/14/2025 BULD - Electrical Clearance Passed Ok to set meter for new service
03/14/2025 COT - LCEL - Grounding/Bonding Passed
04/29/2025 zzzPDSD Building Division - Site Excavation/Layout/Rebar Passed
05/02/2025 TRSP - ROW - Final/Close-Out Passed
04/29/2025 COT - LCBU - Framing Passed
04/29/2025 COT - LCBU - Masonry Pregrout Passed
04/29/2025 COT - LCBU - Preslab Passed
04/29/2025 COT - LCEL - Electrical Above Ceiling Passed
05/02/2025 COT - LCBU - Building Final Passed
05/02/2025 COT - LCEL - Electrical Final Passed
05/02/2025 COT - LCME - Mechanical Final Passed
05/02/2025 COT - LCPL - Plumbing Final Passed
05/02/2025 ENGR Engineering Final Passed This is a pass on the building only. The development package still needs to be completed.
05/02/2025 COT - LCEL - Electrical Intermediate Passed
05/05/2025 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
2886 N. 1ST AVE. - OUTDOOR LIGHTING INSPECTION LETTER - 6 13 25_V1.PDF DOCUMENTS VIEW
2886 N. 1ST AVE. - STUCCO SPEC SUBSTITUTION APPROVAL LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-PLAN SET_V3_V1.PDF DOCUMENTS VIEW