Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0523-01329
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/02/2024 | Site Engineering | APPROVED | |||
12/14/2023 | Site Zoning | APPROVED | |||
01/02/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/11/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 12/7/2023 10:34:45 PM Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/6/2023 9:25:47 AM 1. Resolved - Sheets AO2.1 and AO3.1: Show the ramp edge protection details meeting the requirements of 2018 IBC section 1012.10, 2009 ICC A117.1 sections405.9.1 or 405.9.2. 2. Unresolved - Sheets AO2.1 and AO3.1: Include the roof access ladder projection dimension and show the required ramp landing clear width is equal to the ramp width. (2009 ICC A117.1 section 405.7.2 and Figure 405.7) The roof access ladder was relocated to a different wall but the drawings on sheets AO0.1 and AO4.1 still show the ladder located at the bottom landing of the ramp. Please coordinate and revise the drawings. 3. Resolved - Sheets AO2.1 and AO3.1: Show the handrail details, guard height, and the guard opening dimensions meeting the requirements of 2018 IBC sections 1015.3 and 1015.4. TIGER LIFE SUPPORT (AW) 1. Resolved - Sheet AW5.1: Show the handrail details and the guard height meeting the requirements of 2018 IBC section 1015.3. Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Approved with Comments Reason: Date Completed : 6/11/2023 11:18:00 PM Approved/subject to field approval Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 6/16/2023 3:04:09 PM Electrical Review of Zoo By: Ron Ross PE Approved with the following comments/suggestions to incorporate into IFC document. 233 ESP1.0 OVERALL SITE PLAN - POWER: Keynotes 11 & 12 don’t point to anything. 234 ESP1.1 ENLARGED SITE PLAN - POWER AREA 1: Keynotes are ‘A’ and ‘B’, not 1 & 2 as used by drawing. 239 EA2.1 ASIA PAVILION - LIGHTING PLAN: Missing exit sign in Storage/Laundry Room 18. 240 EA2.2 ASIA PAVILION - POWER PLAN: Could not locate Keynotes 13, 14, 15, and 16. 241 EA2.3 ASIA PAVILION - ROOF POWER PLAN: Missing from set as per sheet index. 245 EF2.1 PHEASANTRY- ELECTRICAL PLANS: An extra Keynote #6 is on detail #2. 248 ER2.2 REPTILE BUILDING - POWER PLANS: Missing Keynote descriptions for 4, 5, and 21. 249 ER2.3 REPTILE BUILDING - ROOF POWER PLAN: Missing Keynote #1. 253 EU2.1 TIGER PAVILIONS - ELECTRICAL PLANS: Comment only, Circuits are being supplied by the LNSC panel, but isn’t panel LNT closer or more convenient? 256 EN3.0 ELECTRICAL SINGLE LINE DIAGRAM AND CALCULATIONS: One Line for SESR shows conductor between Panel DHNR and 45 KVA transformer is larger than what is used for short circuit calculations. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 12/9/2023 12:50:59 PM Third Plumbing Review: Outstanding comment -15, 1). Resolved-Drinking fountain on plan page AA2.1 needs to be high/low type -IPC 410.3 2). Resolved--Plan pages AA2.2, AR2.3, AT2.2, needs to include gutter & downspout sizing calculations - IPC 1106.1, 1106.3, 1106.6 **Sizing Calculations not shown** 3).Resolved-Plan page AA2.2, PC2.1, needs to show secondary scupper locations. -IPC 1106.5, 1108 Resolved see PC2.1 4). Resolved--Plan page AA2.2 needs to include scupper sizing calculations. -IPC 1106.5, 1108 5).Resolved-The added overflow scupper detail # 9 on AF5.1 needs to have the over flow scupper located in the parapet wall adjacent to the primary scupper it can't be part of the downspout assembly beyond the structure, if the primary parapet wall opening becomes blocked the overflow scupper needs to be located to allow relief separate -IPC 1106.5, 1108 Resolved See PF2 6). Resolved-Plan page Ar0.1 needs to include a high/low drinking fountain & service sink. -IPC 403.1 7). Resolved-Lavatories on plan page P0.1 need ASSE 1070 mixing valves -IPC 419.5 8).Un-resolved-provide site utility piping plan for continuation of sewer, water, & storm as stated throughout plumbing plans. - IPC 106.3.1 ** NOT SENT** 9). Resolved- label grease waste on Plan page P2.1 & PA2.3 -IPC 106.3.1 10). Resolved- The 4 storm connected Fd-3 drains on plan page PA2.1 appear to be connected to areas that communicate with the interior of the building. floor drains can't connect to storm. -IPC 1104.2 11). Resolved-Add Gas sizing table used to plan pages PA2.4, P02.2, PR2.2 -IFGC 402.4 12). Resolved-Water line to #9 Drinking Pool on plan page PC2.1 needs a separate backflow device -IPC 608.3, Table 608.1 13). Resolved-Water line to #12 Drinking Pool on plan page PPF2.1 needs a separate backflow device -IPC 608.3, Table 608.1 14). Resolved-The #15 pool filler needs a backflow device on plan page P02.1 -IPC 608.3 15).Unresolved - Install a backwater valve on the otter House #12 added storm riser line on plan page P02.1, if storm backed up it would overflow in to sanitary system drains nearby. - - IPC 1101.3 16). Resolved-Plan page P02.1 or M02.1 needs to illustrate pool heater exhaust & combustion air -IFGC 304, 503.1 ** Subject to field inspections & manufacturer install instructions** 17). Resolved-Exterior Drinking Fountain on plan page PR2.1 Needs an over hang above -IPC 1101.3 18). Resolved-Does the exterior Tortoise floor drain that is connected to the sanitary have a roof above? -IPC 1101.3 19). Resolved-Gutter on plan page PT2.2 is undersized -IPC 1106.6 20). Resolved-The domestic system that supplies the hot and cold pond fill on plan page P3.1 isn't properly protected -IPC 608.3 |
||
12/05/2023 | PDSD Application Completeness | REVIEW COMPLETED |