Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0523-01178
Parcel: 13507440D

Address:
7800 E 22ND ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.4

Permit Number - TC-COM-0523-01178
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/08/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
08/03/2023 Site Engineering REQUIRES RESUBMIT See zoning comment
08/03/2023 Site Zoning REQUIRES RESUBMIT FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: TC-COM-0523-01178
7800 E. 22nd St. – C-2
Auto Sales – New Building (4th Review)

TRANSMITTAL DATE: ‎August 3, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the C-2 zone (UDC 4.7.21). Auto Sales is a permitted use in the zone, (Table 4.8-4), subject to Use Specific Standards 4.9.9.G.1& .2.

1. COMMENT: Zoning has reviewed the building plans for compliance with Development Package (DP) TD-DEV-0423-00209 and it appears that the plans match. Until the DP is approved by all review agencies Zoning cannot approve the building plans.
If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
08/08/2023 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Daljit Benipal
dbenipal@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 7/20/2023 11:40:56 AM
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall
not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 5/22/2023 2:50:15 PM



Mechanical(M) Reviewer
Neil Samaan
nsamaan@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 7/13/2023 7:05:50 PM
All corrections complied
Approved/subject to field approval




Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved
Reason:
Date Completed : 7/15/2023 7:12:01 PM



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 8/4/2023 9:40:14 PM
Third Plumbing Review: **Plans OK Subject to Field Inspections**
1). OK
2). OK
3). OK
4). OK
5). OK-Plan submittal needs to be accompanied by site utility piping for sewer & water service correlation & continuation -IPC 106.3.1 ** OK Subject to Field Inspections**
6). OK
7). OK
8). OK
9).OK
08/02/2023 PDSD Application Completeness REVIEW COMPLETED