Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel13507440E
13507440D
13507440C
City of Tucson ZoningI-1, C-2
Tucson WardWard 4
Flood Related Information

FEMA Floodplain Area

Tucson Registered NeighborhoodDietz
Major Streets & Routes

Arterial or Collector

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Historic Records Requests

Address: 7800 E 22ND ST
Date - 11/24/2024 5:57 a.m.
Total Number Of Historic Records Requests - (4)
Name Action
Address: 7800 E 22ND ST - Doc Type: CERT OF OCC VIEW
Address: 7800 E 22ND ST - Doc Type: CERT OF OCC VIEW
Address: 7800 E 22ND ST - Doc Type: CERT OF OCC VIEW
Address: 7800 E 22ND ST - Doc Type: CERT OF OCC VIEW

Rezoning Cases

Date - 11/24/2024 5:57 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-85-95 141 - 22nd St - Pantano Pwky height limitation of 35 feet Effectuated 08/11/2012

Special Development Requests & Requirements

Address: 7800 E 22ND ST
Date - 11/24/2024 5:57 a.m.
Total Number Of Special Development Permits - (2)
Activity Number Status Apply Date Expired Date Unit Type Description
H000000305 CLOSED 05/05/2008 N/A Historical Information
T21SA00511 COMPLETE 11/23/2021 N/A Zoning Adminstration Letter Zoning compliance letter for automobile dealer

Permits

Address: 7800 E 22ND ST
Date - 11/24/2024 5:57 a.m.
Total Number Of Permits - (46)
Permit Status Apply Date Expired Date Unit Type Description
D00-0053 Approved 09/07/2000 N/A Development Package STEVE CHRISTY CHRYSLER/JEEP
T22RW03132 Complete 08/29/2022 11/01/2022 Right-of-Way (ROW) NEXT GENERATION WILL REWIRING TRAFFIC SIGNALS IN THE INTERSECTION OF 22ND ST/PANTANO RD. SIDEWALK W
TZ-PMT-0823-00086 Needs Resubmittal 08/02/2023 N/A Zoning Permit Annual Project #P05429 LHM Jeep Tucson
TC-COM-0523-01178 Needs Resubmittal 05/02/2023 04/29/2024 Commercial Building This project is a new automotive showroom and service garage building with a second floor parts inventory area. It is type IIB construction and is fully sprinklered.
TD-DEV-0423-00209 Approved 04/11/2023 04/10/2024 Development Package A development package for the demolition of an existing automobile dealership and construction of a new automobile dealership with associated site and utility improvements.
T00AN00754 ISSUED 09/21/2000 N/A ADDRNEW
T00BU03623 FINAL 12/13/2000 05/03/2008 TANKS TANK: 2 1000 GALLON
T00BU03681 FINAL 12/21/2000 08/28/2001 SPKLR FIRE:SPKR:6NEW
T00CM04698 FINAL 09/21/2000 09/17/2001 COMBO TI:RETAIL & ADDITION:SERVICE CENTER
T00EL02934 FINAL 12/26/2000 08/13/2001 ELECT ELECTRIC:ADD 2 CIRCUITS
T01BU00174 FINAL 01/24/2001 08/28/2001 SPKLR FIRE:SPKR:37 NEW
T01BU00429 FINAL 02/20/2001 08/28/2001 SPKLR FIRE:SPKR:ADD 21
T01BU00447 FINAL 02/21/2001 08/28/2001 SPKLR FIRE:SPKR:ADD8
T01EL00265 FINAL 02/05/2001 08/06/2001 ELECT ADDN:1 CIRCUIT
T01EL00728 FINAL 03/29/2001 02/16/2002 ELECT SIGN:ELECTRIC:2229
T01EL01590 FINAL 06/19/2001 08/14/2002 ELECT SIGN:ELECTRIC:2567
T01OT00649 FINAL 10/01/2001 11/24/2002 SIGN SIGN:3118
T04OT00365 FINAL 02/23/2004 04/06/2005 SIGN SIGN:6759
T05EX00518 CLOSED 05/04/2005 07/03/2005 EXCAV REPAIR AND RECONSTRUCT EXISTING SEWER
T06BU01851 WITHDRWN 07/26/2006 01/22/2007 TENTS (2) 20 X 60 CANOPIES FOR CAR & TRUCK SALE AT STEVE CHRISTY CHRYSLER JEEP
T07BU02573 FINAL 12/11/2007 06/14/2008 SPKLR Relocate 1 sprinkler head
T07CM00464 FINAL 02/06/2007 09/04/2007 COMBO TEMPORARY MOBILE SALES OFFICE
T07MS00066 ISSUED 03/02/2007 N/A MISC
T07OT02207 C OF O 09/27/2007 01/17/2009 #01 C-OF-O C OF O:SERVICE BLDG
T07OT02208 C OF O 09/27/2007 01/17/2009 #02 C-OF-O C OF O:PARTS & SERVICE
T07OT02209 C OF O 09/27/2007 01/17/2009 #03 C-OF-O C OF O:SHOWROOM /office/training
T07OT02520 CLOSED 11/06/2007 05/04/2008 SIGN 13981
T08CM02532 FINAL 07/22/2008 06/21/2009 COMBO TI: SERVICE BAY
T08CM03962 WITHDRWN 12/22/2008 N/A #01 COMBO ADDT: CARWASH
T08OT01003 FINAL 04/24/2008 11/03/2008 SIGN 14876
T08OT01103 FINAL 05/07/2008 12/06/2008 SIGN 14946
T11EX00485 CLOSED 09/13/2011 11/12/2011 EXCAV TRENCH, INSTALL AND REPAIR CONDUIT FOR COX COM FIBER OPTICS
T13OT00970 FINAL 08/16/2013 10/12/2014 SIGN 6- IDENTICAL ILLUM WALL SIGNS ON N. & W. ELEVS. C OF C ON 2- DF'S 1- ILLUM WALL SIGN ON SW ELEV.
T16TC00912 FINAL 04/14/2016 N/A BARRICAD Starting at TEP pole on the S/south of 22nd St and west of Pantano Rd, aerial attachment going N/E 146ft. Aerial attachment continues east 573ft, riser down pole into existing riser and pull coax S/E in existing conduit 201ft. Pull continues S/E out of ROW. Project# 41520160000CTU0076
T18RW00228 FINAL 01/11/2018 04/06/2018 ROW Bore 393' and trench 43' 1-4" cndt. Dig pit to locate conduit, changeout 2 ped to charles peds, place 1-3048 handhole and access 2 manholes (mh 11724 to splice and MH 13165 to pull fiber). 03/12/2018-PLAN CHANGE- 2nd Revision: Need to add a MH access to HH13803. 7800 E 22nd St. CTL Job N.322579
T19CM00777 FINAL 02/01/2019 08/19/2019 #01 COMBO FOUNDATION REPAIR
T19RW02765 FINAL 05/16/2019 07/20/2019 ROW ACCESSING MH #11724 TO SPLICE FIBER
T19RW03612 FINAL 06/24/2019 08/25/2019 ROW ACCESSING MH #11724 TO SPLICE FIBER
T19RW07600 FINAL 12/18/2019 04/02/2020 ROW N.543693 - JOB WILL REQUIRE ACCESS TO MH #11724 TO PLACE FIBER
T21RW04063 FINAL 09/01/2021 10/20/2021 ROW LANDSCAPE MAINTENANCE SERVICES FOR MEDIANS & ROADSIDES CONTACT NO. 212536 P.O. No. 42376 PALM & TREE CARE ON MEDIAN ISLANDS ALONG PANTANO RD FROM RESEARCH LP TO 22ND ST. ROLLING SET UP WITH MINIMUM RESTRICTIONS ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
T22RW02266 FINAL 06/21/2022 10/09/2022 ROW PALM & TREE CARE ON COT MEDIAN ISLANDS - STREET ARTERIALS & COLLECTORS - MEDIAN ADJACENT LANES CLOSURE - ROLLING SET UP WITH MINIMUM RESTRICTIONS. WORK LOCATION IS ALONG PANTANO RD FROM RESEARCH LP TO 22ND ST. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
T97BU01208 WITHDRWN 07/01/1997 12/28/1997 TENTS TEMPORARY TENT FOR DESERT MAZDA
T97BU01531 WITHDRWN 08/05/1997 02/01/1998 TENTS TEMPORARY TENT FOR AUTO SALES
T97BU01788 WITHDRWN 09/05/1997 03/04/1998 TENTS TEMPORARY TENT FOR CAR SALES
T97BU01992 WITHDRWN 10/01/1997 03/30/1998 TENTS TEMPORARY TENT FOR:CAR SALES
T99BU03135 FINAL 11/15/1999 03/26/2008 SPKLR FIRE SPKR:ADD 8

Plans

Address: 7800 E 22ND ST
Date - 11/24/2024 5:57 a.m.
Total Number Of Plans - (4)
Plan Number Status Application Date Exp Date Unit Type Description
TE-BAS-0923-00200 Approved 09/27/2023 N/A -- Commercial Water Harvesting Ordinance A development package for the demolition of an existing automobile dealership and construction of a new automobile dealership with associated site and utility improvements.
TP-PRE-1222-00068 Complete 12/27/2022 N/A -- Pre-Application Conference Kimley-Horn is the consultant for Asbury Automotive Group. This project consists of demolishing the existing parking lot and associated utilities and build a new Jeep dealership with a storage parking lot.
TW-MWP-0623-00051 Withdrawn 06/21/2023 06/20/2024 -- Water Master Plan - Single-Phase Construction of a new automotive dealership with associated site improvements
TW-WAV-0523-00162 Approved 05/05/2023 05/04/2025 -- Water Availability Proposed auto dealership, car wash, vehicle service center, show room.

Record Requests

Address: 7800 E 22ND ST
Date - 11/24/2024 5:57 a.m.
Total Number Of Requests - (3)
Request Number Status Request Date Completed Date Type Description
REQ-0123-00688 Complete 01/10/2023 02/08/2023 Requests Any adjacent roadway or utility plans or any civil plans for the parcel itself. Building plans are NOT needed. Parcel number 13507440D & 13507440C
REQ-0223-01365 Complete 02/28/2023 04/11/2023 Requests *ALL HISTORICAL DATA PREVIOUSLY UPLOADED. Please refer to 'H000000305' on the PRO site after performing an address search.* - D00-0053 STEVE CHRISTY CHRYSLER/JEEP Development Package
REQ-1023-05903 Approved 10/30/2023 10/30/2023 Requests This project is a new automotive showroom and service garage building with a second floor parts inventory area. It is type IIB construction and is fully sprinklered.