Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0426-00616
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/20/2026 | Commercial Electrical Standard | APPROVED | |||
| 07/20/2026 | Outdoor Lighting Standard | APPROVED | |||
| 07/21/2026 | Water - PDSD Standard | APPROVED | |||
| 07/24/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/21/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Heating and cooling calculations are not included with the current submittal. [Initial comment: Provide heating and cooling load calculations to justify the heating/cooling capacity of the new RTUs. Reference: Section C403.1.1 and C502.2.3, IECC 2018.] If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov. |
||
| 07/21/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | The roof hydrant is located downstream of the backflow preventor serving the yard hydrant, creating a cross connection. Non-potable labeling is required for the roof hydrant. [Initial comment: Freeze-proof yard hydrants using a below-grade stop-and-waste valve are prohibited unless an approved upstream backflow prevention device is used to protect the upstream potable water source and the downstream outlets. (Detail 6, Sheet P-2) Reference: Sections 608.8 and 608.9.1, IPC 2024.] . If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov. |
||
| 07/24/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TC-COM-0426-00616 (1st Review) Project: New Construction of an auto parts retail store. Location: 4975 E BENSON HY Review Date: 7/24/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering Reviewer Contact: Marco.contreras@tucsonaz.gov Related cases: TD-DEV-0326-00072 Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed to ensure final approval from Site Engineering. To help speed up your resubmittal and facilitate shorter review timelines, please include a response letter along with your updated plans and any supporting calculations. In your response letter, address each comment individually and explain what changes were made and where they can be found in the plans. Please do not mark or highlight changes in the drawings at this stage — revision markups are only used after a permit has been issued. Submit your response letter and updated plan set as two separate files. Site Engineering Review Comments: 1. Site Engineering has completed its review of the submitted building plan set and cross-referenced it against the associated Development Package. However, final approval of Commercial TC-COM-0426-00616 cannot be granted until the associated submission of the Development Package TD-DEV-0326-00072 has received full approval and has been issued. Per UDC §3.3.3.G, building permits for sites requiring a Development Package may not be issued prior to DP approval, as the building plans must be consistent with an approved site plan. Please resubmit for final approval once the Development Package has been approved and issued by all applicable reviewers. |
||
| 07/24/2026 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Jeffrey W. Cassidy, Planner Planning & Development Services Department – Current Zoning Review Section PROJECT: TC-COM-0426-00616 – Commercial – New AutoZone Store 5031 E Valencia Rd, AZ 85706 (PAD-21 Zoning) Commercial Building Plan Review – 2nd Review TRANSMITTAL DATE: July 24, 2026 1. COMMENT: Zoning has completed its review of the submitted building plan set and cross-referenced it against the associated Development Package. However, final approval of Commercial Permit TC-COM-0426-00616 cannot be granted until the associated revision to Development Package TD-DEV-TD-DEV-0326-00072 has received full approval and has been issued. Per UDC §3.3.3.G, building permits for sites requiring a Development Package may not be issued prior to DP approval, as the building plans must be consistent with an approved site plan. Please resubmit for final approval once the Development Package has been approved and issued by all applicable reviewers. For final approval, ensure the building plans match the approved DP regarding footprint, proposed height, and square footage, and that the downspout and structure drainage systems shown in the building plans are consistent with those depicted in the Development Package plan set. 2. COMMENT: Provide this TC-COM-0426-00616 permit number and the associated development package case number, TD-DEV-0326-00072, adjacent to the title block on each sheet. 3. COMMENT: Additional comments may be forthcoming on the next review based on responses to Zoning and other PDSD reviewer comments. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: 4. COMMENT: Corrected commercial building permit. 5. COMMENT: Provide a detailed response letter with your submittal that clearly shows how you have addressed all Zoning comments. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home . Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/old-pdfs/double-old/resubmittals.pdf If you have any questions about this transmittal, please contact jeffrey.cassidy@tucsonaz.gov The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code . |
||
| 07/02/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |