Permit Details

Status:
Awaiting Submittal
Type:
Commercial Building
Address:
4975 E BENSON HY
Address NEW:
4975 E BENSON HY
Apply Date:
04/27/2026
Applicant:
Saanya Papar
Description:
New Construction of an auto parts retail store.

Permit Reviews

Permit Number - TC-COM-0426-00616
Permit Status: Awaiting submittal
Permit Description: New Construction of an auto parts retail store.
Start Date Submittal Complete Date Status  
04/29/2026 COMMERCIAL REVIEW - FULL v.1 05/26/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0426-00616
Permit Status: Awaiting submittal
Permit Description: New Construction of an auto parts retail store.
Total Outstanding Activity Conditions - 13
Date Name
04/29/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
04/29/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/19/2026 AIR BALANCING REPORT IS REQUIRED.
05/19/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/19/2026 SPECIAL INSPECTION FOR EXPANSION ANCHOR AND/OR EPOXY ANCHORS IS REQUIRED.
05/19/2026 SHELVING FIXTURE ANCHORING PLAN & DETAILS SUBMITTED AS A DEFERRED SUBMITTAL FOR REVIEW AND APPROVAL PRIOR TO FINAL.
05/19/2026 ROOF FRAMING LAYOUT PLAN & CALCS SUBMITTED AS A DEFERRED SUBMITTAL FOR REVIEW AND APPROVAL PRIOR TO FINAL.
05/19/2026 SPECIAL INSPECTION FOR SOIL COMPLIANCE PRIOR TO FOUNDATION INSPECTION, SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/19/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
05/19/2026 STOREFRONT PLAN & CALCULATIONS SUBMITTED AS A DEFERRED SUBMITTAL FOR REVIEW AND APPROVAL PRIOR TO FINAL.
05/19/2026 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
05/19/2026 WATER STERILIZATION REPORT IS REQUIRED.
05/19/2026 SPECIAL INSPECTION FOR WELDING IS REQUIRED.