Permit Number: TC-COM-0426-00560
Parcel: 13213104A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0426-00560
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/06/2026 Outdoor Lighting Standard APPROVED
05/07/2026 Water - PDSD Standard APPROVED
05/11/2026 Site Zoning Standard NOT REQUIRED
05/12/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/04/2026 Commercial Building Standard REQUIRES RESUBMIT Building (B) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Denied
Date Completed: 5/1/2026
1.Sheet G1.2/Applicable Codes:The incorrect edition of the ICC/ANSI A117.1 is listed under the applicable codes.
Provide the correct edition of this applicable standard.
2.Sheet G1.2/Occupancy Classification:While it's understood that the overall use of the structure is classified as a
group E, a welding lab is also present. This is classified as an F-2 use. This does not classify as an accessory us as it
exceeds 10% of the floor area. Provide clarification as to the separation approach. Separated Mix Use or Non-
Separated Mix Use. (2024 IBC Section 508.1)
3.Sheet G1.2/Occupancy Classification:Provide clarification as to what activities will be occurring in the construction
lab, as this might be classified as a different use. (2024 IBC Section 508.1)
4.Sheet G1.2/Occupancy Classification:Provide clarification as to what activities will be occurring in the shared lab, as
this might be classified as a different use. (2024 IBC Section 508.1)
5.Sheet G1.2/Occupancy Load Calculations:Provide a space-by-space occupant load calculation. Group use together
is not the correct method for calculating an occupant load. (2024 IBC Section 1004.3)
6.Sheet G1.2/Occupancy Load Calculations:Incorrect occupant load factors were used for the classrooms. There is no
distinction between a classroom and a vocational classroom in Table 1004.5. Provide a corrected occupant load
calculation. (2024 IBC Section 1004.1 and Table 1004.5)
7.Sheet G1.2/Occupancy Load Calculations:There are several conference rooms (121, 105, 201, 212, and 222) that
have not been considered in the occupant load calculation. This space is considered an assembly space when
calculating occupant loads. There is a distinct difference between occupancy classification and occupancy use. The
exceptions provided in Section 303.1.2 apply to that of classification and the requirements of max. allowable area,
height, stories, mix-use requirements, and overall classification of the building. So yes, these rooms are considered a
business in the context of the structure and can comply with the previously mentioned business requirements.
However, when calculating occupant loads, one must base calculations on the intended use of the space. These
rooms are used for assembly, and the occupant load must be calculated accordingly. Provide a corrected occupant
load calculation. (2024 IBC Section 1004.1, Table 1004.5, 303.1.2)
8.Sheet G1.2/Exit access travel distance:The exit travel distance to the plan east does not include the travel on the
exterior exit access stairs. Since these stairs are not a protected exit, the travel distance must be measured down the
stairs to the exit discharge. Provide a corrected exit access travel distance measurement. (2024 IBC Section 1017.3
and 1017.3.1)
9.Sheet G1.2/Rated exits:Provide clarification to the plan for the west stair enclosure. Is this being considered an
interior exit stairway with the associated ratings? Provide all rated wall details as well as rated doors. If not see
comment #8.
05/04/2026 Commercial Electrical Standard REQUIRES RESUBMIT Electrical (E) Reviewer
Ron Ross; rross@safebuilt.com
Discipline Status:Denied
Date Completed: 4/24/2026
1.E1.1(ELECTRICAL SITE PLAN):Need to provide burial depths in Electrical Notes for all circuits that pass under
driveways or other areas as per 2020 NEC table 300.5.
2.E4.1(LIGHTING FLOOR PLAN - LEVEL ONE):Need to provide emergency Exits or E-lights to be on unswitched
circuits or wired ahead of switched circuits as per NEC 700.17 or IBC 1008.3.
3.E4.1(LIGHTING FLOOR PLAN - LEVEL ONE)/Classrooms 127, 128 & 129:Need to provide lighting circuit.
4.E4.2(LIGHTING FLOOR PLAN - LEVEL TWO):Need to provide emergency Exits or E-lights to be on unswitched
circuits or wired ahead of switched circuits as per NEC 700.17 or IBC 1008.3.
5.E8.1(ELECTRICAL SCHEDULES)/EH2:Need to revise and reformat VA numeric values in panel schedule EH2.
Currently values have 3 dots (i.e. #...) at end of values indicating additional numbers that are not shown, and VA unit
shows (i.e. # VA) end of numeric value in all of the phase columns.
6.E8.2(ELECTRICAL SCHEDULES)/all:Need to revise and reformat VA numeric values in panel schedules. Currently
values have 3 dots (i.e. #...) at end of values indicating additional numbers that are not shown, and VA unit shows (i.e.
# VA) end of numeric value in all of the phase columns.
7.E8.3 (ELECTRICAL SCHEDULES)/all:Need to revise and reformat VA numeric values in panel schedules. Currently
values have 3 dots (i.e. #...) at end of values indicating additional numbers that are not shown, and VA unit shows (i.e.
# VA) end of numeric value in all of the phase columns.
05/04/2026 Commercial Mechanical Standard REQUIRES RESUBMIT Mechanical (M) Reviewer
Jorge Valido; jvalido@safebuilt.com
Discipline Status:Denied
Date Completed: 5/4/2026
1.General -VAV 1-11 supply CFM at the Grills/diffusers id 950 CFM. VAV Schedule on Plan Sheet M5.1 states for VAV
1-11 Cooling 800 CFM Minimum 200 CFM. Confirm Supply air CFM for VAV 1-11. - 2024 IECC Section
C105.2Information on Construction Documents - 2024 IBC Section [A]107.2.1Information on Construction Documents.
2.General -Tag/identify all Supply grills/diffusers for VAV2-08. - 2024 IECC Section C105.2Information on Construction
Documents - 2024 IBC Section [A]107.2.1Information on Construction Documents.
3.General -VAV 2-13 on Plan Sheet M1.2 states "24x6 DL 600 CFM (TYP. 4 PL.)". It should state "24x6 DL 600 CFM
(TYP. 5 PL.)". - 2024 IECC Section C105.2Information on Construction Documents - 2024 IBC Section
[A]107.2.1Information on Construction Documents.
4.General -Provide an Air Balance Schedule for the first area. - 2024 IECC Section C408.2.2 System Adjusting and
Balancing.
RESUBMITTAL DIRECTIONS:
•All corrections must be clouded, delta numbered, with a brief explanation within the plan sheet or the title block of the
sheet. For corrections or revision to whole plan sheets, you need only cloud the sheet number and provide the delta
identification number, with a brief explanation of the change(s).
•As part of the resubmittal, please collate all revised sheets into the electronic document (PDF) and submit a complete
and full plan set. We cannot accept individual sheets in response to review comments, since the entire plan set is
required for approval and permitting.
•Please include with the resubmittal a separate response narrative, which is numbered or itemized to correspond to
each of the noted review comments items.
•This response narrative must clearly address how each issue was corrected or resolved and indicate where the
information may be found within the construction documents. The response narrative must be typewritten, on a
letterhead noting the project name, with the Permit Application Number. Failure to provide this response narrative may
result in review delays or rejection of the resubmittal.
•Once all electronic construction documents (plan sheets, energy compliance certificates, reports, calculations, etc.)
have been revised according to the above directions. Please resubmit the complete revised plan set with a separate
copy of response narrative PDF through the municipality to complete the review.
•Review of revised construction documents in response to this letter may take upwards of 5 (five) business days,
depending on the size of the project and the volume of plans in queue at time of resubmittal.
05/04/2026 Commercial Plumbing Standard REQUIRES RESUBMIT Plumbing (P) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Denied
Date Completed: 5/1/2026
1.General/Fixture Calculations:The occupant load calculations provided are incorrect. Provide correct occupancy load
calculations with updated plumbing fixture calculations. (2024 IPC Section 403.1)
2.General/DFU Calculations:No DFU calculations have been provided. Provide detailed DFU calculations. (2024 IPC
Section 709.1)
3.General / Floor Drains:Floor drains are shown without trap seal protection. Revise to include trap primers. (2024 IPC
Section 1002.4.1)
4.General/Missing Details:There are many critical plumbing details that are missing. Provide all critical missing details.
05/12/2026 Fire New Construction Standard REQUIRES RESUBMIT Resolve building review comments.
Questions: patricia.shelton@tucsonaz.gov
05/11/2026 Site Engineering Standard REQUIRES RESUBMIT Site Engineering Review

TC-COM-0426-00560
3300 S PARK AV BLDG 3

Description:
New 2-story Building 3 on a vocational educational campus. Scope includes the building, parking lot, and connection between the second stories of existing Building 2 and new Building 3.

Site Engineering comments are as follows:

1. This commercial building permit cannot be approved until the associated development package, TD-DEV-0825-00212, is approved by all reviewers. UDC Article 3.3.3.G.7.a
2. Ensure that the permit submittals match. Re-submit this permit once the above-mentioned DP is approved by all reviewers.

To re-submit, visit the Tucson Development Center Online at:
https://tdc-online.tucsonaz.gov/#/home

The instructions for resubmittal can be found at: Revisions and Resubmittals

Engineering Associate: Ryan Insalaco
ryan.insalaco@tucsonaz.gov
04/20/2026 PDSD Application Completeness Express REVIEW COMPLETED