Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0426-00560
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/09/2026 | Commercial Building Standard | APPROVED | Building (B) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 6/5/2026 Structural (S) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 6/9/2026 |
||
| 06/09/2026 | Commercial Electrical Standard | APPROVED | Electrical (E) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 6/9/2026 |
||
| 06/09/2026 | Commercial Plumbing Standard | APPROVED | Plumbing (P) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 6/5/2026 |
||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| N/A | Site Engineering Standard | PENDING ASSIGNMENT | |||
| 06/09/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Mechanical (M) Reviewer Jorge Valido; jvalido@safebuilt.com Discipline Status:Denied Date Completed: 6/8/2026 1.(RESOLVED) - General -VAV 1-11 supply CFM at the Grills/diffusers id 950 CFM. VAV Schedule on Plan Sheet M5.1 states for VAV 1-11 Cooling 800 CFM Minimum 200 CFM. Confirm Supply air CFM for VAV 1-11. - 2024 IECC Section C105.2Information on Construction Documents - 2024 IBC Section [A]107.2.1Information on Construction Documents. ◦VAV 1-11 Supply CFM 850. VAV Schedule on Plan Sheet M5.1 states for VAV 1-11 Cooling 800 CFM Minimum 200 CFM. VAV 1-11 has a 50 CFM deficit. 2.(UNRESOLVED) - General -Tag/identify all Supply grills/diffusers for VAV2-08. - 2024 IECC Section C105.2Information on Construction Documents - 2024 IBC Section [A]107.2.1Information on Construction Documents. ◦Comment not addressed. No correction made. 3.(RESOLVED) - General -VAV 2-13 on Plan Sheet M1.2 states "24x6 DL 600 CFM (TYP. 4 PL.)". It should state "24x6 DL 600 CFM (TYP. 5 PL.)". - 2024 IECC Section C105.2Information on Construction Documents - 2024 IBC Section [A]107.2.1Information on Construction Documents. ◦Comment not addressed. Correction not made. 4.(UNRESOLVED) - General -Provide an Air Balance Schedule for the first-floor Welding Lab area. - 2024 IECC Section C408.2.2 System Adjusting and Balancing. ◦Should have read "Provide an Air Balance Schedule for the first-floor Welding Lab area". Welding Lab has 30000 CFM Exhaust system with 28 hood systems. Supply air to welding lab is VAV 1-01 and VAV 1-02 which equals 5500 CFM of supply air. There is also a 44x20 Return air duct from PAC-1 (4900 CFM). Where is the Makeup air coming from? - 2024 IECC Section C408.2.2 System Adjusting and Balancing. |
||
| 06/04/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |