Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0425-00832
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/12/2025 | Commercial Mechanical Standard | APPROVED | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 5/7/2025 5:12:17 PM |
||
| 05/12/2025 | Commercial Plumbing Standard | APPROVED | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 5/12/2025 7:27:26 AM |
||
| 05/16/2025 | ROW Engineering Review Standard | NOT REQUIRED | |||
| 05/29/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/12/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 5/1/2025 9:11:45 PM 1. Sheet S2.1 / Statement of Special Inspections: The Statement of Special Inspections provided on Sheet S2.1 appears incomplete and more information is required. Per the 2018 International Building Code Section 1704.2.3, along with the construction documents, the applicant shall submit a Statement of Special Inspections as a condition for permit issuance. A full list of what this statement shall include is provided in the 2018 IBC Section 1704.3.1. Highlights include: i. Statement shall identify the materials and work required to have special inspections or tests, ii. The type and extent of each inspection, and iii. Identification as to whether each inspection shall be performed continuously or periodically, as defined by the IBC. 2. General / Special Inspection Certificate: Please have the Registered Design Professional in Responsible Charge of this project complete and return the City of Tucson Special Inspections Certificate with signatures. The form can be downloaded at: https://www.tucsonaz.gov/files/sharedassets/public/city-services/planning-developmentservices/documents/special_inspection_certificate.pdf 3. Sheet S2.1 / General Notes / Risk Category: Please update the structural general notes on Sheet S2.1 to include the risk category for this project as required by the 2018 IBC Sections 1603.1.4.1 and 1603.1.5.1. 4. Sheet S2.1 / Wind Design Criteria / Components and cladding pressure: Please update the structural general notes on Sheet S2.1 to include the design wind pressures used to design the new exterior canopies. Components and cladding wind pressures shall be expressed in pounds per square foot in accordance with the 2018 IBC Section 1603.1.4.5. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 5/6/2025 10:52:29 AM 1. Sheet G1.2/Doo Swing: Door 15B does not swing in the correct direction. Provide a correctly swing door. (2018 IBC Section 1010.1.2.1) 2. Sheet A3.1/Exit Lighting: No exit signage has been provided on the RCP or egress plan. Provide exit signage. (2018 IBC Section 1013) 3. Sheet A3.1/Egress Illumination: No egress illumination has been provided on the RCP or egress plan. Provide egress illumination. (2018 IBC Section 1008) 4. Sheet A2.2/Door Schedule: No detailed door schedule has been provided. Provide a detailed door schedule. |
||
| 05/12/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 5/5/2025 11:12:49 AM 1. E4.0: Re-evaluate Total Service Load. Service is a 240 Volt Delta Center tap. The two single phase panel loads are across the center tap portion of the delta transformer and not equally loaded across all three transformer legs. Can derate calculations per engineering judgement, can disregard NEC 25% continuous load adder, and/or use prior electric service load history if building has same loading profile. However, review and resubmit service calculation for permit. If it is determined that the service needs to be upgraded, include revised One-Line. |
||
| 05/12/2025 | Outdoor Lighting Standard | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 5/5/2025 11:12:49 AM 1. E4.0: Re-evaluate Total Service Load. Service is a 240 Volt Delta Center tap. The two single phase panel loads are across the center tap portion of the delta transformer and not equally loaded across all three transformer legs. Can derate calculations per engineering judgement, can disregard NEC 25% continuous load adder, and/or use prior electric service load history if building has same loading profile. However, review and resubmit service calculation for permit. If it is determined that the service needs to be upgraded, include revised One-Line. |
||
| 05/29/2025 | Site Engineering Standard | REQUIRES RESUBMIT | Proposed work on South face of building requires a Development Package or Public Improvement Agreement with City of Tucson Department of Transportation and Mobility. | ||
| 05/21/2025 | Site Zoning Standard | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC TC-COM-0425-00832 700 N STONE AV. - C-3 TI Admin Office (1st Review) TRANSMITTAL DATE: May 21, 2025 Resubmit revised drawings with a detailed response letter stating how all Zoning Review Section comments were addressed. The site is in the C-3 zone (UDC 4.7.22). Administrative and Professional Office is an allowed use in the zone (UDC Table 4-8-4) 1. As work is proposed within the right-of-way a right-of-way use permit & temporary revokable easement (TRE) is required. Contact COT Transportation & Mobility (DTM) and secure the appliable permits/easements. Zoning cannot approved this permit unit approved by DTM. The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 05/13/2025 | Fire New Construction Standard | REVIEW COMPLETED | Alterations to the fire alarm or fire sprinklers system requires a separate submittal and permit. Fire extinguishers shall comply with section 906 of the 2018 IFC | ||
| 04/25/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 05/16/2025 | Water - PDSD Standard | REVIEW COMPLETED |