Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0425-00783
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/14/2025 | Commercial Mechanical Standard | APPROVED | |||
| 05/14/2025 | Commercial Plumbing Standard | APPROVED | |||
| 05/22/2025 | Site Zoning Standard | APPROVED | |||
| 05/16/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 05/22/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/12/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete construction documents, plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1. , City of Tucson Commercial Plan Submittal Requirements. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf 2. Please have an Arizona Registrant provide a damage report indicating that findings are comprehensive regarding the damage sustained by the structure(s). IBC 107.2.1 3. Provide amend the plans to add a detailed description indicating the scope of the project. IBC 105.1 4. Provide amend the construction documents indicating where the damage occurred on the building. IBC 107.2.1 5. Please amend the construction documents to detail the new construction in the damaged areas. IBC 107.2.1 6. Please amend the plans to list the any deferred submittals with a note to not install until approved. IBC 107.3.4.1. For example, Wood Trusses Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 |
||
| 05/01/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0425-00783 (6024 S KIRTLEY DR TUCSON, AZ 85706) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf 2. The provided plans are cut off and not readable. 3. These plans are old plans the original build and cannot be used. 4. Provide a complete plan set specific to the scope of work included in this permit. |
||
| 05/05/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 04/23/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |