Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0425-00736
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/28/2025 Commercial Building Standard APPROVED NOTE TO REVIEWER: PLEASE READ INTERNAL NOTES ON "SAME SET OF PLANS" BEFORE COMMENCING REVIEW.

Structural(S) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 4/25/2025 3:02:11 PM


Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 4/25/2025 3:01:46 PM
04/28/2025 Commercial Mechanical Standard APPROVED NOTE TO REVIEWER: PLEASE READ INTERNAL NOTES ON "SAME SET OF PLANS" BEFORE COMMENCING REVIEW.

Mechanical(M) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 4/25/2025 3:02:01 PM
04/28/2025 Commercial Plumbing Standard APPROVED NOTE TO REVIEWER: PLEASE READ INTERNAL NOTES ON "SAME SET OF PLANS" BEFORE COMMENCING REVIEW.

Plumbing(P) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 4/25/2025 3:02:06 PM
05/01/2025 Fire New Construction Standard APPROVED And operational permit and commodity classification submittal is required for high pile storage for all storage buildings.
05/08/2025 Site Engineering Standard APPROVED NOTE TO REVIEWER: PLEASE READ INTERNAL NOTES ON "SAME SET OF PLANS" BEFORE COMMENCING REVIEW.
05/07/2025 Site Zoning Standard APPROVED NOTE TO REVIEWER: PLEASE READ INTERNAL NOTES ON "SAME SET OF PLANS" BEFORE COMMENCING REVIEW.
05/06/2025 Water - PDSD Standard APPROVED NOTE TO REVIEWER: PLEASE READ INTERNAL NOTES ON "SAME SET OF PLANS" BEFORE COMMENCING REVIEW.
05/08/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
04/28/2025 Commercial Electrical Standard REQUIRES RESUBMIT NOTE TO REVIEWER: PLEASE READ INTERNAL NOTES ON "SAME SET OF PLANS" BEFORE COMMENCING REVIEW.

Electrical(E) Reviewer
Jessica Hull
jhull@safebuilt.com
Denied
Reason:
Date Completed : 4/27/2025 6:41:21 PM
Sheet E0.2/Electrical Specifications/missing electrical code reference. Under Part 1-General, section (B) Codes, Regulations
and Standards reference the applicable year editions regarding standards, specification and codes for #2, (a,b,c,d,e, f,g). to
the correct adopted code edition. (2018 IBC, NEC 2017)
Sheet E0.2/Electrical Specifications/missing electrical code reference. Under Part 1-General, section G, #2, revise plans to
include the applicable year (2017) when referencing the NEC 17. (2018 IBC, NEC 2017)
Sheet E0.2/Electrical Specifications/missing electrical code reference. Under Part 2-Products and Execution, section A, #3,
#9, section D,#3,#6(a), section F#5, revise plans to include the applicable year (2017) when referencing the NEC 17. (2018
IBC, NEC 2017)
Sheet E7.1/Electrical Details/missing information. Revise plans to identify what Dry-Type Transformer in detail 1is
referencing, the existing TEP transformer or suite transformers. (NFPA 70, NEC 17 – 450.11)
Sheet E7.1/Electrical Details/missing transformer information. Revise plans to include the existing transformer and new
proposed suite transformer’s nameplate information. (1) Name of manufacturer (2) Rated kilovolt-amperes (3) Frequency (4)
Primary and secondary voltage (5) Impedance of transformers 25 kVA and larger (6) Required clearances for transformers
with ventilating openings (7) Amount and kind of insulating liquid where used (8) For dry-type transformers, temperature
class for the insulation system. (NFPA 70, NEC 17- 450.11)
Sheet E7.1/Electrical Details/incorrect reference. Electrical note #2 references the 2005 NEC, revise note with correct
reference to the 2017 NEC. (2018 IBC-2701.1)
Sheet E7.1/Electrical Details/missing bonding jumper size. Revise plans to include the (existent and newly proposed)
transformers systems sizes of the bonding jumper, equipment bonding jumper and the grounding electrode, conductors are
to be sized per the current NEC code. (NFPA 70, NEC 17 – 250.52, 250.66 and 250.102(c))
Sheet E5.1 & E6.1/ Electrical Single Line & Schedule/ incorrect reference. The electrical single line diagram references
feeder tag 204 from feeder schedule/cu, noting a Ground size of 6. Review NEC 17 Table 250.66 for correct size of
grounding and revise. (NFPA 70, NEC 17 – 250.66)
Sheet E6.1/Electrical Schedules/missing code reference. Revise feeder schedule notes to include the applicable year edition
of the NEC 2017 when refencing the NEC. No year was included. (2018 IBC-2701.1)
Sheet E6.2/Electrical Panel Schedules/branch. Revise the panel schedule to include a more specific equipment identification
and area served other than the tag # ID of the branch circuits description. (NFPA 70, NEC 17 – 408.4)
04/25/2025 Outdoor Lighting Standard REQUIRES RESUBMIT The Outdoor Lighting Review, for the individual Tennent Improvement (TI) permits, cannot be approved until the outdoor lighting on the Shell permits (T21CM09776, T21CM09775) is approved for Outdoor Lighting compliance.

Required corrections for permits T21CM09776, T21CM09775.
1. Show lamps with a maximum of 3500K color temperature, OLC 402.1. See On Shell Building plans, sheet E0.3, Lighting Fixture Schedule, which shows all outdoor light fixtures at 4000K color temperature. Updating the color temperature of the lighting fixtures may require the outdoor lumen calculations to be updated.
2. Submit catalogue or specification sheets of all proposed new outdoor lighting fixtures illustrating the type of fixture, color temperature, lumens rating and whether full cut-off or unshielded. (T21CM09776, T21CM09775)
3. An Outdoor Lighting Special Inspection is required for this site. Provide an Outdoor Lighting Special Inspection Certificate, with Parts A and B completed and Sealed, to each Shell permit (T21CM09776, T21CM09775). https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf
04/16/2025 PDSD Application Completeness Express REVIEW COMPLETED