Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.3

Permit Number - TC-COM-0424-00682
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/17/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
06/17/2024 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

The previous plan review comment #2 requested more detail pertaining to the scope of work.

Originally stated as, "Installation of new SWS”. The revised ‘Scope of work’ description added,” 1 section of switchgear to the existing (ok I get that). Then goes on to state,” to feed a 2000 amp switchgear lineup to feed all the UPS tenant electrical distribution system”.

1 Please define, “switchgear line-up”.

2 Only the new load centers are shown per the electrical line diagram. “all the UPS tenant electrical distribution system” is not shown. Please clarify. If all the ‘tenant UPS tenant electrical distribution system’ is to be installed under a different permit, please state this on the plans. Or provide in detail on the plans, what is new work per this permit and what is future work to be permitted separately.

3 If “all the UPS tenant electrical distribution system, is included per this permit, provide a complete electrical power and lighting plan set including complete panel schedule for any panels subject to new loads..

4 Explain why the ‘ELECTRICAL OVERALL POWER PLAN, and the ‘ELECTRICAL POWER PLAN NORTH’ both showing existing equipment and detailed areas are included in the plan set. Is this simply to show the locations of the new equipment? Please clarify.

Please designate or identify the load calculations for ‘DPA’ in the Main Service load calculations.

Please respond to the electrical review comments in detail.

Ref; 2018 IBC section 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements.
05/30/2024 PDSD Application Completeness REVIEW COMPLETED