Permit Number: TC-COM-0423-01158
Parcel: 117120310

Address:
1 E CONGRESS ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0423-01158
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/15/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
05/21/2023 Design Review REQUIRES RESUBMIT At the 5/19/23 DRB meeting, the DRB continued the case to the 6/16/23 DRB meeting, requesting the applicant to return to the DRB after exploring ways to provide shade on the south sidewalk.
06/15/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: TC-COM-0423-01158

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

Structural(S) Reviewer
Daljit Benipal
dbenipal@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 6/14/2023 1:24:50 PM
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.

Building(B) Reviewer
Janet Matz
jmatz@safebuilt.com
Denied
Reason:
Date Completed : 6/15/2023 3:52:25 AM
Please be advised, the drawings did not contain enough information for a full review. Additional comments may be required once all the information is provided.
1. Update the project narrative on sheet AS1.1 that indicates a TI interior remodel, only the replacement of the existing window with an ATM and deposit box was included in the submittal.
2. Provide a sheet index for the project on the drawings.
3. Indicate on the drawings that all work will be done in accordance with the following codes as adopted by the City of Tucson.
2018 International Building Code
2018 International Fire Code
2017 National Electrical Code
ICC A117.1- 2009
1. Provide a code analysis of the existing building including the construction type, occupancy type, and if the building is fully sprinklered or has a fire alarm present.
2. Provide construction details for the installation of the ATM and Deposit box in the existing opening including the new required fill. Indicate if the exiting header will remain in place from the window or if additional structural support will be required.
3. Provide accessibility details for the new ATM and drop box on the drawings.

Mechanical(M) Reviewer
Neil Samaan
nsamaan@safebuilt.com
Denied
Reason:
Date Completed : 6/8/2023 8:13:29 PM
1. Provide mechanical plans (IMC2018,106.3.1)
2. Provide ventilation calculations (IMC2018,,403.3.1.1.1)

Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 6/10/2023 10:53:45 AM
Electrical Review
By: Ron Ross PE
Denied
There was no electrical design dwgs submitted to be approved.


Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 6/12/2023 10:37:03 PM
First Plumbing Review:
1). Provide demo plan -IPC 106.3.1
2). Provide plumbing plans -IPC 106.3.1
05/23/2023 Site Engineering REQUIRES RESUBMIT See Zoning Comment
05/18/2023 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: TC-COM-0423-01158
1 E. Congress St. – OCR-2
Financial Service & Exterior ATM (1st Review)

TRANSMITTAL DATE: ‎May 18, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the OCR-2 zone (UDC 4.7.27). Financial Service is a permitted use in the zone, (Table 4.8-4).

1. COMMENT: As this site is located within the Down Town Core and Rio Nuevo Area (RNA) and exterior changes are proposed Design Review is required prior to approve of this TI. Contact Maria Gayosso at Maria.Gayosso@tucsonaz.gov for requirements.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
05/13/2023 Fire New Construction REVIEW COMPLETED
05/08/2023 PDSD Application Completeness REVIEW COMPLETED