Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0423-01131
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/21/2023 | Site Engineering | APPROVED | |||
05/11/2023 | Site Zoning | APPROVED | |||
06/06/2023 | Water - PDSD | APPROVED | |||
06/06/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
05/19/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 5/17/2023 5:47:23 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 5/12/2023 3:37:01 PM 1. Sheet G0.2: There is a distinct difference between occupancy classification and occupancy use. The exceptions provided in Section 303.1.2 apply to that of classification and the requirements of max. allowable area, height, stories, mix-use requirements and overall classification of the building. The conference rooms are considered a business classification in the overall context of the structure and can comply with the business requirements previously mentioned. However, when calculating occupant loads, one must calculate based on the use of the space. The conference room's use is assembly as well as the game and break rooms, and the occupant load must be calculated as such in accordance with Section 1004 and Table 1004.5. Provide an updated space by space occupant load calculation in accordance with Section 1004. Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Conditionally Approved Reason: Date Completed : 5/5/2023 10:00:16 PM Approved/subject to field approval Electrical(E) Reviewer Ron Ross rross@safebuilt.com Conditionally Approved Reason: Date Completed : 5/17/2023 8:35:18 PM Electrical Review of Building 808 By: Ron Ross PE 148. E2.1LC1 LIGHTING EGRESS CALCULATIONS: Why are there large Max/Min ratios in some office areas? 164. E3.1J2 INSTALL SYSTEMS PLAN AREA 'J2': Could not locate Keynote 3. 165. E3.1J3 INSTALL SYSTEMS PLAN AREA 'J3': Keynote 12 not pointing at correct equipment. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Conditionally Approved Reason: Date Completed : 5/7/2023 7:38:50 PM Ok Subject to Field inspections |
||
05/09/2023 | Fire New Construction | REVIEW COMPLETED | |||
05/03/2023 | PDSD Application Completeness | REVIEW COMPLETED |